Skip to content
SAM.govCloses in 6 days

58--RMM,AIRCRAFT,MATERI, IN REPAIR/MODIFICATION OF

Location
United States, United States
Responses due
Oct 14, 2026

Overview

CONTACT INFORMATION|4|N722.29|B4S|771-229-0465|alexis.t.hoepfl.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19| | | | | | | | | | | | | | | | | | | | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2| | | HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|MIL-I-45208 OR EQUIVALENT|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Reports Combo||TBD|N00383|TBD|TBD|See Schedule|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1| | MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Alexis Hoepfl| VALUE ENGINEERING (JUN 2020)|3| | | | INTEGRITY OF UNIT PRICES (NOV 2021)|1| | EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4| | | | | WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 Year|45 days of discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4| | | | | TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2| | | BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11| | | | | | | | | | | | SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7| | | | | | | | BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5| | | | | | BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1| | ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13| | | | | | | | | | | | | | ROYALTY INFORMATION (APR 1984)|1| | NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2| |X| This is a repair requirement for NSN 7RH 5836 015830123 / Part Number2028844-032. This item, NIIN 015830123 / Part Number 2028844-032, has a DD254 requirement. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the dateof asset acceptance under the terms of the contract. For purposes of thissection, Return is defined as physical receipt of the F-condition asset at thecontractor's facility as reflected in the Action Date entry in the CommercialAsset Visibility (CAV) system. In accordance with the CAV Statement of Work,the contractor is required to accurately report all transactions by the end ofthe fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. Required RTAT: 68 days after receipt of asset. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in the subsequent contract. Throughput Constraint: Contractor must provide a Throughput Constraint for each NSN(s). Total assetsto be repaired monthly after initial delivery commences X/month (contractorfill in #). A throughput of 000 per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in daysis not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: RMM,AIRCRAFT,MATERI ;2028844-032; P/N, ;5836 015830123; NSN, ;OEM Technical Drawings; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. RMM,AIRCRAFT,MATERI ;DRS Training & Control Sys, LLC; Company Name , ;645 Anchors Street NW Fort Walton Beach, FL 32548-9990; Address , ;12339; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Source: SAM.govView in Constructeams

Similar open bids

SAM.govCloses today

Bitterroot Front 10 Year G-Z IRSC

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Proposals are being requested and a separate written solicitation will not be issued. Solicitation number 12363N26R4014 is issued as a Request for Proposal (RFP) for the Bitterroot Front G-Z Long Term Integrated Resource Service Contract. The Bitterroot Front Project area spans roughly 145,000 acres across the Stevensville and Darby Ranger Districts, where dense, overstocked mixed?conifer stands and widespread tree mortality have increased susceptibility to insect outbreaks and extreme wildfire behavior. Following a decade of severe fires, the project aims to reduce wildfire risk to nearby communities and restore forest health through treatments such as thinning, harvesting, mechanical fuel reduction, and prescribed burning. These efforts focus on improving stand vigor, promoting fire?adapted species, reducing hazardous fuels, and enhancing safety and effectiveness for wildfire responders. A secondary objective of the long?term contract is to provide a consistent timber supply for local forest products industries, while contractors complete tasks including unit layout, timber cruising, road work, and timber removal as part of a broader strategy to increase the pace and scale of forest restoration. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 113310 and the small business size standard is 500 Employees This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Proposals are to be submitted via email to Mark Phillipp at mark.phillipp@usda.gov and Matt Daigle at matthew.daigle@usda.gov.

United States
Due Oct 8, 2026View bid
SAM.govCloses today

Bitterroot Front 10 Year G-Z IRSC

8/3/2026- Replaces word versions of Attachements C04c_2a, C04d_3a and C04e_4a (Appendicies A-C) with PDFs. No other corrections. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Proposals are being requested and a separate written solicitation will not be issued. Solicitation number 12363N26R4014 is issued as a Request for Proposal (RFP) for the Bitterroot Front G-Z Long Term Integrated Resource Service Contract. The Bitterroot Front Project area spans roughly 145,000 acres across the Stevensville and Darby Ranger Districts, where dense, overstocked mixed?conifer stands and widespread tree mortality have increased susceptibility to insect outbreaks and extreme wildfire behavior. Following a decade of severe fires, the project aims to reduce wildfire risk to nearby communities and restore forest health through treatments such as thinning, harvesting, mechanical fuel reduction, and prescribed burning. These efforts focus on improving stand vigor, promoting fire?adapted species, reducing hazardous fuels, and enhancing safety and effectiveness for wildfire responders. A secondary objective of the long?term contract is to provide a consistent timber supply for local forest products industries, while contractors complete tasks including unit layout, timber cruising, road work, and timber removal as part of a broader strategy to increase the pace and scale of forest restoration. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 113310 and the small business size standard is 500 Employees This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Proposals are to be submitted via email to Mark Phillipp at mark.phillipp@usda.gov and Matt Daigle at matthew.daigle@usda.gov.

United States
Due Oct 8, 2026View bid
NYC City RecordCloses today

SMD_Services IDIQ Contract for Annual Cleaning and Inspection of Gravity Roof Tanks at Various NYCHA Buildings, Citywide

Scope of Work:  The annual inspection, cleaning and disinfection of roof tanks on NYCHA properties in compliance with all applicable New York City, New York State, and Federal regulations. at various developments citywide. All work shall comply with applicable laws, codes and standards, including but not limited to NYC Health Code §§ 141.07 & 141.09, Rules of the City of New York, Title 24, Chapter 31, NYC Administrative Code § 17-194, Plumbing Code §§ 606.5 / 606.5.4.3, NYS Sanitary Code, Part 5, ANSI/AWWA/APHA/WEF Industry Standards, Safe Drinking Water Act (SDWA), §28-301.1 of the NYC Construction Code, NYC Local Law 76, Occupational Safety and Health Administration (OSHA) as well as any other regulatory requirements that pertain to gravity water tanks (roof tanks) within the city of New York. Each tank shall be inspected, cleaned, disinfected and sampled for E.Coli and Total Coliform at a minimum annually during each one (1) year period of this contract. Tanks may be cleaned and sampled multiple times a year. Contract Term: 3 years from the award date on NYCHAs Purchase Order.  NYCHA, in its sole discretion, shall have the option to extend the Term of this Contract for up to 2 one-year renewals. Bid Security: 100% of Contract Minimum. Payment & Performance Bonds: 100% of Minimum. Labor Law 220i Public Work Registration Certificate/Certification: Pursuant to Article 8, Section 220-i of the New York State Labor Law. The Bidder and each subcontractor must be registered with the New York State Department of Labor. See https://dol.ny.gov/contractor-and-subcontractor-landing.  For additional information refer to the Important Bid Notice document attachment included in this RFQ.  This Solicitation is not subject to PLA. This solicitation does not require PQL. Section 3 Resident Economic Opportunity Plan: Section 3 Resident Economic Opportunity (REO) Plan must be submitted via eComply, https://nycha.ecomply.us/. Do not include Section 3 documentation within bid submission via iSupplier. For eComply log-in assistance contact eComply Tech support, support@ecomplysolutions.com. For Section 3 submission assistance contact NYCHAs SMP Vendor Support team at eComply.support@nycha.nyc.gov  Pre-Bid Conference: A non-mandatory, but strongly recommended, MS Teams Pre-bid Conference will be held on September 9, 2026, at 1:00 PM  To join us, please follow the instructions below: Option 1: Click the following link or copy, and paste and go it into a new web browser: https://teams.microsoft.com/meet/284356622821641?p=SIlxBEu2AMZmRVxu4a Meeting ID: 284 356 622 821 641 Passcode: fk9AV7Yt Option 2: Dial in by phone +1-646-838-1534 United States, New York City Phone conference ID: 638894668# RFQ Question Submission Deadline: September 16, 2026 Questions regarding this RFQ should be sent to the following email address: construction.procurement@nycha.nyc.gov. Question & Answer Release Date: September 23, 2026. Only questions regarding this RFQ submitted to construction.procurement@nycha.nyc.gov (include RFQ number in subject field) prior to Question Deadline will be accepted. In addition to the documents attached below, bidders are directed to review the Special Notices and Conditions, Instructions to Bidders, and General Conditions prior to submitting a bid.  To access these documents, click on the 'Contract Terms' tab above, and then 'Preview Contract Terms,' to download a PDF version. Prior to submitting a bid, confirm the bid response includes all required forms and documentation and that all are properly completed, signed, and notarized, where applicable. It is the bidders sole responsibility to complete and submit its bid via iSupplier to the corresponding RFQ prior the RFQ Bid Submission Deadline. NYCHA is not responsible for delays caused by technical difficulty or caused by any other occurrence. Only electronic bids submitted online via iSupplier will be accepted. For assistance regarding iSupplier please email NYCHA Procurement at procurement@nycha.nyc.gov. Please note that if NYCHA receives no responses to this RFQ, the bid submission deadline shall be automatically extended for seven (7) days. This does not limit NYCHA's right to extend the bid deadline for any other reason. Current Prevailing Wage Links are posted on iSupplier under the Quick Links Section of Sourcing Supplier.  The vendors are responsible for remaining informed of all updates to the Prevailing Wage Schedule.

New York
Due Oct 8, 2026View bid
NYC City RecordCloses today

SMD_Services_Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Repair of Gravity Roof Tanks (Office of Water Quality) at Various NYCHA Buildings Citywide

Scope of Work: The scope of work includes repairing any leaks, cracks, or damage found in wooden or steel gravity tanks, including but not limited to conical covers, flat decking, hatch doors, ladders, plugs, strainers, piping, plumbing components, valves, electrical systems, probes, control wiring, conduit, co applicable city, state, and federal codes, regulations, all materials, equipment, and workmanship used in these repairs shall comply with all relevant city, state, and federal codes, as well as applicable regulations and industry standards governing construction, safety, and domestic water systems. Contract Term: three years from the award date on NYCHAs Purchase Order.  NYCHA, in its sole discretion, shall have the option to extend the Term of this Contract for up to two one-year renewals. Bid Security: 100% of Contract Minimum ($50,000). Payment & Performance Bond:100% of Minimum ($50,000). Labor Law 220i Public Work Registration Certificate/Certification: Pursuant to Article 8, Section 220-i of the New York State Labor Law .The Bidder and each subcontractor must be registered with the New York State Department of Labor. https://dol.ny.gov/contractor-and-subcontractor-landing.  For additional information refer to the Important Bid Notice document attachment included in this RFQ. This Solicitation is not subject to PLA. This solicitation does not require PQL. Section 3 Resident Economic Opportunity Plan: Section 3 Resident Economic Opportunity (REO) Plan must be submitted via eComply, https://nycha.ecomply.us/. Do not include Section 3 documentation within bid submission via iSupplier. For eComply log-in assistance contact eComply Tech support, support@ecomplysolutions.com. For Section 3 submission assistance contact NYCHAs SMP Vendor Support team at eComply.support@nycha.nyc.gov. Pre-Bid Conference: A non-mandatory, but strongly recommended, MS Teams Pre-Bid Conference will be held on September 9, 2026, at 3:00 PM, and will be conducted remotely via Microsoft Teams meeting. To join us, please follow the instructions below: Option 1: Click the following link or copy, and paste and go it into a new web browser: Join: https://teams.microsoft.com/meet/247843415108182?p=s7S895ctg6lwFXC4rX Meeting ID: 247 843 415 108 182 Passcode: f4oN2E3n Option 2: Dial in by phone +1 646-838-1534,,168007653# United States, New York City Phone conference ID: 168 007 653# RFQ Question Submission Deadline: September 16, 2026 Questions regarding this RFQ should only be sent to the following email address: construction.procurement@nycha.nyc.gov.  Question & Answer Release Date: September 23, 2026 Prior to submitting a bid, confirm the bid response includes all required forms and documentation and that all are properly completed, signed, and notarized, where applicable. It is the bidders sole responsibility to complete and submit its bid via iSupplier to the corresponding RFQ prior the RFQ Bid Submission Deadline. NYCHA is not responsible for delays caused by technical difficulty or caused by any other occurrence. Only electronic bids submitted online via iSupplier will be accepted. For assistance regarding iSupplier please email NYCHA Procurement at procurement@nycha.nyc.gov. Please note that if NYCHA receives no responses to this RFQ, the bid submission deadline shall be automatically extended for seven (7) days. This does not limit NYCHA's right to extend the bid deadline for any other reason. Current Prevailing Wage Links are posted on iSupplier under the Quick Links Section of Sourcing Supplier.  The vendors are responsible for remaining informed of all updates to the Prevailing Wage Schedule.

New York
Due Oct 8, 2026View bid
NYC City RecordCloses today

SMD_A&CM_RFQ #517985 - Elevator Rehabilitation at Cassidy Lafayette/Woodson Houses

Scope of Work * The Work under this Contract (RFQ No. 517985  Elevator Package) consists of the rehabilitation, modernization, maintenance, and service of twelve (12) elevators across six (6) residential buildings, including eight (8) elevators in four (4) buildings at Cassidy-Lafayette Houses and four (4) elevators in two (2) buildings at Woodson Houses. The Contractor shall provide all labor, materials, equipment, supervision, and incidental services necessary to complete the Work in accordance with the Contract Documents. * The scope includes, but is not limited to, the removal and replacement of existing elevator systems and the furnishing and installation of new elevator equipment, including machines, controls, hoistway components, car enclosures, doors, rails, communication systems, safety devices, and associated electrical components. The Work also includes testing, inspection, commissioning, training, and coordination with NYCHA and other trades, including a separate electrical package. * The Work shall be performed in phased construction to maintain building operations, with coordination requirements intended to minimize service interruptions and impacts to residents. The Contractor shall comply with all scheduling, outage duration, and performance requirements established in the Contract Documents. * In addition to construction and modernization activities (Part A), the Contractor shall enter into a separate Maintenance and Service Agreement (Part B) to provide ongoing elevator maintenance and support services following completion of modernization.   RFQ Solicitation Timetable A non-mandatory virtual pre-bid conference will be held on 09/23/2026 at 11:00 am, via Microsoft Teams. Pre bid Teams Meeting information: (646) 838-1534 Conference ID: (232 863 912 982 698) Passcode: nx9B2q4T. Although attendance is not mandatory; it is strongly recommended that all interested vendors attend. https://teams.microsoft.com/meet/232863912982698?p=fwqq9XfVdWnGivNGMi All questions related to this RFQ are to be submitted via email to the A&CM Procurement Unit at acm.procurement@nycha.nyc.gov with the RFQ number as the Subject line by no later than 09/25/2026 on 2:00PM Bidders will be permitted to ask additional questions at the Pre-bid Conference. Responses to all submitted questions will be available for public viewing in Sourcing under the RFQ. Bid Submission Requirements Vendors shall electronically upload a single .pdf containing ALL components of the bid into iSupplier by the RFQ Bid Submission Deadline. NYCHA will NOT accept hardcopy Bids or bids via e-mail, fax, or mail. Instructions for registering for iSupplier can be found at http://www1.nyc.gov/site/nycha/business/isupplier-vendor-registration.page After Bidder registers for iSupplier, it typically takes 24 to 72 hours for Bidders iSupplier profile to be approved. Site Visits - September 24, 2026 RFQ Question Deadline - September 25, 2026 - 02:00 PM Question and Answer Release Date - October 01, 2026  It is Vendors sole responsibility to complete iSupplier registration and submit its Bid before the RFQ Bid Submission Deadline. NYCHA is not responsible for delays caused by technical difficulty or caused by any other occurrence. For assistance regarding iSupplier please email Procurement@nycha.nyc.gov

New York
Due Oct 8, 2026View bid
SAM.govCloses today

KB Duct List

Salient Characteristics SpecificationTitle: Galvanized Steel Quick-Disconnect Ductwork and Components for Air-Conditioning SystemSubject: Supply of modular galvanized steel quick-disconnect ductwork, fittings, dampers, and support hangers.Basis of Design: The part numbers below are for reference and configuration cross-reference. Products offered may be from another acceptable manufacturer, provided they meet or exceed all salient characteristics and are fully compatible with the complete ductwork system.1. Scope and PurposeThis requirement is for the supply and delivery only of galvanized steel, modular quick-disconnect ductwork and associated fittings for an air-conditioning system. The supplied components shall form a mutually compatible duct system consisting of straight duct sections, reducers, wye connectors, elbows, airflow dampers, and saddle hangers.Installation, field fabrication, field welding, and connection to existing equipment are not included unless specifically added elsewhere in the solicitation.2. General Salient Characteristics. All offered items shall meet the following minimum requirements: Material: Items 1 through 26 shall be galvanized steel only. No stainless steel, aluminum, plastic, or uncoated carbon-steel substitutes shall be accepted.System Compatibility: All duct, fittings, dampers, and hangers shall be compatible with the specified quick-disconnect duct system. Components of the same nominal duct diameter shall connect directly without adapters, field welding, rivets, sheet-metal screws, or permanent field modification.Quick-Disconnect Connection: Straight duct sections, reducers, wye connectors, elbows, tees, and dampers shall use a quick-disconnect connection configuration compatible with the remaining supplied components. Connection features shall permit assembly and disassembly of the duct system without damage to the duct or fittings.Nominal Dimensions: Duct diameters and fitting dimensions listed in the schedule are nominal inside diameters unless the manufacturer???s standard quick-disconnect system identifies dimensions differently. Reducers shall transition between the listed inlet and outlet diameters. Fittings shall be sized to directly mate with the corresponding duct diameter.Gauge Requirements: Straight duct sections and dampers shall be 20-gauge galvanized steel where identified in the schedule. Reducers, elbows, wye connectors, tees, and 90-degree fittings shall be 18-gauge galvanized steel where identified in the schedule. Saddle hangers shall be 14-gauge galvanized steel where identified in the schedule.Quality and Condition: Products shall be new, free of corrosion, dents, sharp edges, cracks, deformation, damaged coating, or manufacturing defects that would prevent proper assembly or service. Duct sections shall be round, and fittings shall retain their intended shape to allow proper connection. Components shall be packaged and shipped to prevent damage or distortion in transit.Equal Products: An offered equal product shall meet every listed dimensional material, gauge, connection, configuration, and quantity requirement. The offeror shall provide manufacturer specifications or product literature sufficient to verify compliance when requested.3. Required Items ScheduleItem. Required Item / Salient Characteristics. Minimum Material / Gauge. Qty. Reference No.*1. Quick-disconnect straight duct, nominal 24-inch diameter. Galvanized steel, 20 ga 17 EA 10024.2. Quick-disconnect reducer, 24-inch inlet to 22-inch outlet Galvanized steel, 18 ga 5 EA 16024.3. Quick-disconnect straight duct, nominal 22-inch diameter Galvanized steel, 20 ga 20 EA 10022.4. Quick-disconnect reducer, 22-inch inlet to 20-inch outlet Galvanized steel, 18 ga 5 EA 16022.5. Quick-disconnect straight duct, nominal 20-inch diameter Galvanized steel, 20 ga 17 EA 10020.6. Quick-disconnect reducer, 20-inch inlet to 18-inch outlet Galvanized steel, 18 ga 5 EA 16020.7. Quick-disconnect 45-degree wye connector, nominal 24-inch duct size Galvanized steel, 18 ga 1 EA 14224.45.8. Quick-disconnect 45-degree elbow, nominal 22-inch duct size Galvanized steel, 18 ga 1 EA 12022.45.9. Quick-disconnect manual butterfly valve airflow damper, nominal 22-inch duct size Galvanized steel, 20 ga 1 EA 19422.10. Quick-disconnect straight duct, nominal 18-inch diameter Galvanized steel, 20 ga 28 EA 10018.11. Quick-disconnect tee, 18-inch ?? 18-inch ?? 18-inch Galvanized steel, 18 ga 1 EA 14318.12. Quick-disconnect straight duct, nominal 16-inch diameter Galvanized steel, 20 ga 19 EA 10016.13. Quick-disconnect reducer, 18-inch inlet to 16-inch outlet Galvanized steel, 18 ga 3 EA 16018.14. Quick-disconnect 45-degree elbow, nominal 16-inch duct size Galvanized steel, 18 ga 2 EA 12016.45.15. Quick-disconnect manual butterfly valve airflow damper, nominal 16-inch duct size Galvanized steel, 20 ga 2 EA 19416.16. Quick-disconnect 90-degree elbow, nominal 20-inch duct size Galvanized steel, 18 ga 2 EA 12020.90.17. Saddle hanger sized for nominal 24-inch duct Galvanized steel, 14 ga 14 EA 17024.18. Saddle hanger sized for nominal 22-inch duct Galvanized steel, 14 ga 14 EA 17022.19. Saddle hanger sized for nominal 20-inch duct Galvanized steel, 14 ga 14 EA 17020.22. 16-inch galvanized clamp with white nitrile gasket, 27 EA 13016-GA-N.23. 18-inch galvanized clamp with white nitrile gasket, 30 EA 13018-GA-N.24. 20-inch galvanized clamp with white nitrile gasket, 25 EA 13020-GA-N.25. 22-inch galvanized clamp with white nitrile gasket, 28 EA 13022-GA-N.26. 24-inch galvanized clamp with white nitrile gasket, 24 EA 13024-GA-N.*Reference numbers are not brand-name requirements and are included only to identify the intended configuration and compatibility standard. Galvanized Ducting shall be Standard 5-feet Lengths and 11-inch Galvanized Standard Adjustable Sleeves where applicable.4. Component-Specific Requirements shall be galvanized steel:4.1 Saddle Hangers (items 17-21) used for handing duct systems and reducing sway Shall be nominal 24-inch diameter 14 ga 14 EA 17024, 22-inch diameter 14 ga 14 EA 17022, 20-inch diameter 14 ga 14 EA 17020, 18-inch diameter 14 ga 18 EA 17018, or 16-inch diameter 14 ga 14 EA 17016, as identified in the item schedule. Shall use the required quick-disconnect end configuration.4.2 Reducers Shall be galvanized steel, 18 gauge. Shall provide the listed nominal transitions: 24 x 22 inches, 22 x 20 inches, 20 x 18 inches, and 18 x 16 inches. Shall have quick-disconnect ends compatible with the adjoining duct sections.4.3 Elbows, Wye Connector, and Tee, shall be galvanized steel, 18 gauge. Shall have the listed nominal diameter and directional configuration. The wye connector and applicable elbows shall be 45 degrees as listed. The 20-inch elbow shall be 90 degrees. The tee shall be 18 inches ?? 18 inches ?? 18 inches. All ends shall be compatible with the required quick-disconnect duct system.4.4 Airflow Dampers Shall be galvanized steel, 20 gauge. Shall be sized for 22-inch or 16-inch nominal quick-disconnect duct, as identified in the item schedule. Shall be suitable for controlling airflow within the compatible duct system. 4.5 Saddle Hangers Shall be galvanized steel, 14 gauge. Shall be contoured and sized to support the corresponding nominal duct diameter without crushing, deforming, or damaging the duct. Shall be suitable for attachment to the Government???s selected overhead support method. 5. Inspection and Acceptance the Government may inspect delivered items for: Correct item type, nominal size, gauge, and quantity; Galvanized-steel construction; Compatibility of quick-disconnect connections among offered components; Required elbow, wye, tee, reducer, damper, and hanger configurations; Damage, deformation, corrosion, or deficient protective packaging; and Manufacturer literature or other documentation supporting compliance with the salient characteristics. Items that do not meet the stated requirements may be rejected.

United States
Due Oct 8, 2026View bid