Skip to content
SAM.govCloses in 9 days

6150--FY26 NRM 654-26-020 | 654-26-2-6059-0042 | Bldg 12 Pump Power Relocation | VA Sierra Nevada Health Care System Reno, NV

Electrical
Location
United States, United States
Responses due
Aug 14, 2026

Overview

Title: NRM 654-26-020 - Building 12 Pump Power Relocation Description: The Department of Veterans Affairs, Network Contracting Office (NCO) 21, has a requirement for a contractor to provide all personnel, equipment, tools, materials, and supervision necessary to relocate and add additional power legs to the water pumps in the Building 12 basement. Scope of Work: The Contractor shall install emergency power, relocate the normal power onto the existing motor control center (MCC), and install a new manual transfer switch (MTS) to correct existing system deficiencies where pumps currently have no emergency power source. The Contractor must conduct a thorough review of the work area and existing equipment to identify potential pathways and determine the most feasible course of action for installation. Key Requirements: Compliance & Safety: The new normal and emergency electrical systems must be fully compliant with the VA Technical Information Library (TIL), the Veterans Health Administration (VHA) Electrical Design Manual, and all up-to-date safety codes. The contractor must also strictly follow OSHA safety and Lock-Out-Tag-Out (LOTO) procedures. Working Hours & Outages: Standard work hours shall be Monday through Friday, 0700 to 1700, excluding federal holidays. The contractor must give the Contracting Officer's Representative (COR) advanced notice before executing any facility outages. Schedule & Milestones: The contractor must submit a schedule detailing materials, labor, and construction milestones within the first two weeks of the project start date. The entire project must be completed within 180 calendar days after the issuance of the Notice to Proceed (NTP). Certifications: The General Contractor s Competent Person/Superintendent must hold a 30-hour OSHA construction safety certification, and all on-site employees (including subcontractors) must hold a 10-hour OSHA certification. Insurance & Warranty: The contractor must submit documentation from their insurance carrier verifying an Experience Modification Rate (EMR) equal to or less than 1.0. A standard one-year warranty on all materials and workmanship is required. Place of Performance: Services are required at the following location: VA Sierra Nevada Health Care System, 975 Kirman Avenue, Reno, NV 89502-2597. Contract Type: Firm-Fixed-Price Construction Contract, 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.

Source: SAM.govView in Constructeams

Similar open bids

NYC City RecordCloses today

SMD_A&CM_RFQ #517992 - Elevator Rehabilitation and Maintenance and Service at Gun Hill Houses

Scope of work The work under this Contract consists of the rehabilitation, modernization, maintenance, and service of thirteen (13) elevators located in six (6) residential buildings at Gun Hill Houses. The Contractor shall furnish all labor, materials, equipment, supervision, tools, transportation, and incidental services necessary to complete the Work in accordance with the Contract Documents. The Work includes, but is not limited to, the removal and replacement of existing elevator systems and the furnishing and installation of new elevator equipment, including elevator machines, controllers, hoistway components, car enclosures, entrance and car doors, communication systems, safety devices, and associated electrical and electronic components. The Work also includes all required testing, inspections, commissioning, training, and coordination with NYCHA and other contractors, including a separate electrical contractor. The Work shall be performed in phased construction to maintain building operations and minimize disruptions to residents. The Contractor shall coordinate all activities to comply with the scheduling, outage duration, and performance requirements set forth in the Contract Documents. In addition to the construction and modernization services described in Part A, the Contractor shall enter into a separate maintenance and service agreement (Part B) to provide preventive maintenance, repairs, inspections, emergency response, and related elevator support services following the completion and acceptance of the modernization work. RFQ Solicitation Timetable A non-mandatory virtual pre-bid conference will be held on07/09/2026 at 11:00 am, via Microsoft Teams. Pre bid TeamsMeeting information: (646) 838-1534 Conference ID: (227 605772 821 377) Passcode: ok3ap3DK. Although attendance is notmandatory; it is strongly recommended that all interestedvendors attend. https://teams.microsoft.com/l/meetup-join/19%3ameeting_ODBlZmQzOTktNmI4MS00YmM1LWI5YzQtY2IyYjhjODEwNzE0%40thread.v2/0?context=%7b%22Tid%22%3a%22709ab558-a73c-4f8f-98ad-20bb096cd0f8%22%2c%22Oid%22%3a%22d3d463fd-7800-405e-81cf-ed221f645c8a%22%7d All questions related to this RFQ are to be submitted viaemail to the A&CM Procurement Unit atacm.procurement@nycha.nyc.gov with the RFQ number as theSubject line by no later than 07/16/2026 on 2:00PM Bidderswill be permitted to ask additional questions at the Pre-bidConference. Responses to all submitted questions will beavailable for public viewing in Sourcing under the RFQ. Bid Submission Requirements Vendors shall electronically upload a single .pdf containing ALL components of the bid into iSupplier by the RFQ Bid Submission Deadline. NYCHA will NOT accept hardcopy Bids or bids via e-mail, fax, or mail. Instructions for registering for iSupplier can be found at http://www1.nyc.gov/site/nycha/business/isupplier-vendor-registration.page Pre-Bid Conference - July 09, 2026 - 11:00 AM Site Visit - July 13, 2026 - 9:00 AM   RFQ Question Deadline - July 16 2026  - 02:00 PM Question and Answer Release Date - July 23, 2026 After Bidder registers for iSupplier, it typically takes 24 to 72 hours for Bidders iSupplier profile to be approved. It is Vendors sole responsibility to complete iSupplier registration and submit its Bid before the RFQ Bid Submission Deadline. NYCHA is not responsible for delays caused by technical difficulty or caused by any other occurrence. For assistance regarding iSupplier please email procurement@nycha.nyc.gov

New York
Due Aug 5, 2026View bid
TxDOTCloses today

SH 34 IH 20 EB to N of SH 243

Base Repair, Mill and Overlay, Signing and Pavement Markings

Terrell, Texas$7,199,790 (est.)
Due Aug 5, 2026View bid
TxDOTCloses today

FY25 Fort Worth District-wide ADA Projec

ADA Remediation and New Construction

Texas$2,655,169 (est.)
Due Aug 5, 2026View bid
TxDOTCloses today

CS; @ US 81/287 TO FM 3479/HARMON/N TAR

CONSTRUCT NORTH TARRANT PARKWAY OVER US 81/287 WITH TURNAROUND ON EASTSIDE; CONSTRUCT HARMON RD OVER US 81/287

Fort Worth, Texas$22,931,806 (est.)
Due Aug 5, 2026View bid
TxDOTCloses today

US 81; N of Harmon Rd to N of IH 35W

RECONSTRUCT 2 TO 2 LANE NORTHBOUND FRONTAGE ROAD

Fort Worth, Texas$8,290,895 (est.)
Due Aug 5, 2026View bid
TxDOTCloses today

SH 11 from US 259 to Cass C/L

Rehabilitate existing 4-lane highway

Daingerfield, Texas$11,759,396 (est.)
Due Aug 5, 2026View bid