Skip to content
SAM.govCloses in 16 days

Airfield Blast Shield

Structural Steel
Location
Dyess AFB, United States
Responses due
Oct 15, 2026

Overview

1.1 PROJECT DESCRIPTION: 1.1.1 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s), and all applicable Federal, State and local regulations/codes. 2.1 GENERAL: 2.1.1 The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall be considered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectors may be considered provided the drawings and specifications of alternate types are approved by Contracting Officer. The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blast fence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ? velocity @ 900 MPH. 2.1.2 Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access. 2.1.3 Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area, the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting. 2.1.4 Contractor shall provide material submittals for all materials & products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size. 2.1.5 Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations. 3.1 BLAST DEFLECTOR CONTRUCTION: 3.1.1 Structural frames which support the deflecting surface will be of structural shapes, rolled, punches, and prefabricated for bolting together at site. Deflecting surface will be of galvanized corrugated steel with a minimum of 2 oz. zinc coating per Fed. Spec. WW-P-00405. Sheets shall have a section modulus of not less than 0.0163 inches curbed per inch and shall be of corrosion resistant material with yield point in 50,000 psi range. 3.1.2 All bolts subject to blast temperatures shall be of SAE 1038 steel, heat treated. All nuts, except on anchor bolts, shall be made of all-steel, self-locking type. 4.1 BLAST DEFLECTOR ANCHORAGE 4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16”. Lynnco "Epoxy-Locked" anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast deflectors. 5.1 BLAST DEFLECTOR ASSEMBLY: 5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing or burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer. 6.1 BLAST DEFLECTOR FINISH: 6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural members, parts, and corrugated metal will be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized surfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise repaired to the satisfaction of the Contracting Officer. 6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors. The Contactor shall provide a 2’x2’ number sign mounted 15’ above the concrete at the midpoint on the backside of the blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings. 7.1 BLAST DEFLECTOR ALTERNATIVES: 7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an alternate type of blast deflector, providing that the following information and data is submitted, prior to the time of bid opening and approved in writing. 7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and certified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power of similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the deflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi, temperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of blast impingement on deflector. The results of all such readings may not be greater than the readings submitted for the specified deflector, for each corresponding item. 7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and gases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors. 7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for continued testing of similar aircraft and jet engines. 7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting surface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load calculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to blast temperatures. 7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors may not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.

Source: SAM.govView in Constructeams

Similar open bids

SAM.govCloses today

Notice Of Intent To Sole Source - LRS Bus Engine Repair Service

THIS IS NOT A REQUEST FOR COMPETITIVE PROPOSALS/QUOTES The 97th CON Squadron at Altus, OK 73523 intends to solicit and negotiate a sole-source, firm-fixed-price contract for the acquisition of bus engine repair. The 97th Contracting Squadron intends to make award this contract to RUSH TRUCK CENTERS OF TEXAS, LP (CAGE: 99MX9). This acquisition is being conducted as a noncompetitive contract action under the authority of Revolutionary Federal Acquisition Overhaul (RFO) 6.103-1: "Only one responsible source and no other supplies or services will satisfy agency requirements". The 97 LRS/LGRV requires the complete replacement of a failed 8.3L L6 Cummins ISC diesel engine on a government-owned 2009 Bluebird Bus. This specialized vehicle is a critical "1-of-1" asset utilized on Altus AFB for flightline aircrew transport, off-base logistical missions, and military Commercial Driver's License (CDL) training. The vehicle suffered catastrophic internal engine failure during transit and is currently inoperable, occupying space at the Rush Truck Centers facility. In accordance with RFO 6.103-1 the Government has restricted competition due to severe logistical and cost constraints. Because the vehicle is entirely non-operational, soliciting competition from alternative regional mechanics is highly impractical. Transporting the bus would force the Government to incur immediate, non-recoverable heavy-duty towing expenses and redundant diagnostic teardown fees at a secondary facility, directly offsetting any potential savings from competition. This notice of intent is NOT a request for competitive proposals and no solicitation document exists for the requirement. Sources interested in responding to this notice are required to submit a capability statement that includes technical data and cost information, sufficient detail and with convincing evidence that clearly demonstrates the capability to meet the requirement. Requests for documentation, additional information, or submissions that only ask questions will not be considered as an affirmative response. A determination by the Government not to compete based on responses to this notice is solely within the discretion of the Government. Information received will be considered solely for the purpose of determining whether to conduct a competitive procurement or to proceed with a single source procurement. Capability statements are due on 09/29/2026 by 10:00 AM CST. Capability statements shall be submitted by email ONLY as a Microsoft Word or Adobe PDF attachment to phillip.chambers.4@us.af.mil and ryan.lafever.2@us.af.mil. Capability statements and supporting documentation provided after the due date listed above will not be reviewed. Please see attached Single Source Justification for further information.

Wichita Falls
Due Sep 29, 2026View bid
SAM.govCloses today

Repair collision damage to 2023 Dodge Durango Pursuit

This requirement is for repairing body damage and to perform necessary mechanical repairs on a 2023 Dodge Durango Pursuit (Tag number G62-6665Z, VIN# 1C4RDJFG3PC573974). The damage is due to Traffic Accident. Description of work includes Repair of all body damage to the vehicle body, frame, lights and structural components. The requirement is to repair this unit completely for return to service. All equipment must be covered by the manufacturer's warranty. All items shall include standard warranty. Repairs will be completed in accordance with industry standards. Vendors shall be in compliance with all EPA and OSHA standards and requirements. MSDS and any other required documents must be on site. Vendors must be properly insured to cover any losses for GSA vehicles that are in their shop. Valid business license(s) is required in accordance with state and local guidelines. All employees of the selected vendor must be paid in accordance with local Department of Labor established wages.

Houston
Due Sep 29, 2026View bid
LA RAMPCloses today

BEST VALUE - REQUEST FOR QUALIFICATIONS #2710023 & 2710024 - EVANS CAS

ADA UPGRADES & RAISED WALKWAY REMOVAL (BV) (PSA) at Evans Community Adult

California
Due Sep 28, 2026View bid
SAM.govCloses today

Y--MA DIV OF REFUGE FIELD SUPPORT VC TO HQ

Amendment-0001 is issued to extend the solicitation closing time and date to 5:00 PM (Eastern) on Monday, September 28, 2026. All other terms and conditions remain unchanged.

United States
Due Sep 28, 2026View bid
SAM.govCloses today

Y--MA DIV OF REFUGE FIELD SUPPORT VC TO HQ

Amendment-0002 is issued to provide the government response to contractor requests for information. The closing time and date remains unchanged at 5:00 PM (Eastern) Monday, September 28, 2026.

United States
Due Sep 28, 2026View bid
SAM.govCloses today

Multiple Award Task Order Contract (MATOC) Healthcare Facility Construction, Repair, and Renovation Services, Arizona

Multiple Award Task Order Contract (MATOC) Healthcare Facility Construction, Repair, and Renovation Services - ArizonaThe U.S. Army Corps of Engineers (USACE), Los Angeles District, is conducting market research to determine the availability, capability, and interest of qualified firms for a potential Multiple Award Task Order Contract (MATOC) for healthcare facility construction, repair, renovation, and related design services at Department of Veterans Affairs (DVA) facilities throughout the State of Arizona. The anticipated acquisition may include firm-fixed-price task orders for Design-Build (DB), Design-Bid-Build (DBB), renovation, repair, and other healthcare facility construction requirements. This Sources Sought Notice is issued for market research and acquisition planning purposes only. It is not a solicitation, Request for Proposal (RFP), Invitation for Bid (IFB), or Request for Quotation (RFQ), and no contract will be awarded as a result of this notice. Interested firms are encouraged to review the attached Sources Sought Notice for complete information, capability submission requirements, and response instructions.

United States
Due Sep 28, 2026View bid