CA18216 - R9309 Electrical Upgrade EGH Ph 2
Electrical- Location
- Epsom, England, United Kingdom
- Responses due
- Jul 31, 2026
- Budget
- £200,000 (est.)
Overview
Source: Contracts Finder (UK)View in Constructeams
This bid has closed.
Responses were due Jul 31, 2026. Similar open opportunities are listed below — or get alerts when work like this posts again.
Source: Contracts Finder (UK)View in Constructeams
The purpose of this procurement is to procure a supplier to Network re-cable the Dudley College Broadway site, floors A&B&C to a new server room. Cabling points on the wall in classrooms and offices and terminating in the new server room. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18206. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18206 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Applications are invited from Contractors, under the terms of the NEC4 ECSC Short Contract, PEACEPLUS Project for: Ardglass parish church - Upgrade & refurbishment project: A combination of mechanical and electrical upgrades, and general refurbishment activities across multiple areas of an existing operational community facility. The works will be General Construction Work - 45210000-2, Refurbishment over 15K - 45453100-8, Washroom Systems - 45330000-9, Replacement of fire doors - 45421131-1, Installation of internal electrical services - 45310000-3, Internal wall insulation systems - 45321000-3, paving and asphalting works - 45233222-1, fencing installation work - 45340000-2, floor & wall coverings 45432111-5 , joinery second fix 45421000-4 for a period of 4 weeks and will commence not before Sept 2026. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18306. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18306 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Works are essential electrical and mechanical upgrades, including testing and remedial works, replacement of key distribution boards, lighting upgrades to LED standards, and assessment of the lightning protection system. It also includes the replacement of selected air conditioning units and the installation of a new heating system across the property.
The Supplier is required to strip topsoil, including residual vegetation clearance and deposition in Topsoil Storage Areas. Topsoil stockpiles are to be managed by the Subcontractor for the duration of the subcontract works, including spraying and treatment necessary by the Subcontractor to maintain the integrity of the material for re-use. The supplier is required to undertake site clearance, to include but not limited to: Wall removal and set aside for reuse Fence removal and disposal Gate removal and disposal Kerb and drainage removal and disposal Sign post removal and disposal Allowance for removal / cutting of tree root systems and disposal Allowance for hard dig and disposal of arisings
To support the delivery disrepair works delivered by HRS to occupied dwellings, empty properties, and communal areas for circa 21,000 homes (16,000 tenanted properties)
To support the delivery disrepair works delivered by HRS to occupied dwellings, empty properties, and communal areas for circa 21,000 homes (16,000 tenanted properties)