Floor Coverings
- Location
- Stirling, Scotland, United Kingdom
- Responses due
- Aug 12, 2026
- Budget
- £8,000,000 (est.)
Overview
Source: Find a Tender (UK)View in Constructeams
Source: Find a Tender (UK)View in Constructeams
Work covers four developments in the highland and Moray district. The main body of work will comprise of painting the common areas and handrails at the development. Each development may have additional works. Please see the specifications and drawings provided with this tender, along with the pricing schedule. These development are listed as follows: Coppice Court, Grantown-on-Spey (External/Internal) Woodside Court, Grantown-on-Spey (External/Internal) Batchen Court, Forres (External/Internal) Cameron Court, Forres (External/Internal).
Aberdeen City Council, Aberdeenshire Council and Moray Council (together hereinafter referred to as the "Partner Councils") are seeking to procure Operation and Maintenance Services for the Ness EfW Facility for up to 25 years.
The capital investment works and services required will fall under multiple Lots within the Dynamic Purchasing System.
The repairs and maintenance works and services required will fall under multiple Lots with the Dynamic Purchasing System.
East Lothian Council (the Council) will be inviting bids from suitably qualified, competent, capable and experienced contractors who wish to be a successful contractor on a Term Maintenance Contract for Planned & Reactive Maintenance for Gas, Oil and LPG for Non-Domestic Properties. The Term Contract will include the Provision of Annual Inspection, Servicing, Testing, Repairs & Maintenance Contract for Non Domestic Properties for the following: -Natural Gas -Oil -LPG The Term Maintenance Contract will cover a 3-year period from date of acceptance with option to extend it once for 1 year. The Term Contract is expected to start around 31st December 2026. This tender process is a two-stage process with the first stage consisting of a selection stage based on the SPD (Single Procurement Document) where the number of tenderers will be restricted using non-discriminatory selection criteria.
The Gremista Landfill, Lerwick Phase 3 extension will primarily involve cut and fill earthworks, new haul roads, installing new surface water drainage ditches, pipework, manholes, and headwalls; placing a 500mm bentonite-enriched soil layer over the new landfill formation surface; followed by a 2mm HDPE welded geomembrane basal liner, protection geotextile, leachate collection pipework, and 500mm thick, clean aggregate drainage / protection layer. Capping works to the existing Phase 2 landfill area are also included and will comprise 1mm thick LLDPE welded geomembrane and restoration soils.