HS2 OCS - Occupational Health Services (OHS)
- Location
- London, United Kingdom
- Responses due
- Aug 12, 2026
- Budget
- £150,000 (est.)
Overview
Source: Contracts Finder (UK)View in Constructeams
Source: Contracts Finder (UK)View in Constructeams
The Supplier is required to strip topsoil, including residual vegetation clearance and deposition in Topsoil Storage Areas. Topsoil stockpiles are to be managed by the Subcontractor for the duration of the subcontract works, including spraying and treatment necessary by the Subcontractor to maintain the integrity of the material for re-use. The supplier is required to undertake site clearance, to include but not limited to: Wall removal and set aside for reuse Fence removal and disposal Gate removal and disposal Kerb and drainage removal and disposal Sign post removal and disposal Allowance for removal / cutting of tree root systems and disposal Allowance for hard dig and disposal of arisings
To support the delivery disrepair works delivered by HRS to occupied dwellings, empty properties, and communal areas for circa 21,000 homes (16,000 tenanted properties)
To support the delivery disrepair works delivered by HRS to occupied dwellings, empty properties, and communal areas for circa 21,000 homes (16,000 tenanted properties)
1. Purpose of the Role The Work Examiner is responsible for inspecting, reviewing and recording the condition, quality and compliance of works within their allocated area. The role supports safe delivery, identifies defects or non-conformances, and provides clear information to supervisors, engineers and project teams to support timely decision-making. 2. Key Responsibilities • Carry out planned examinations, inspections and site checks in line with the agreed work bank, programme and applicable standards. • Review completed or ongoing works to confirm they meet drawings, specifications, method statements, inspection and test plans, and client requirements. • Identify, record and communicate defects, safety concerns, incomplete works or areas requiring further investigation. • Produce accurate inspection records, reports, photographs and supporting evidence within agreed timescales. • Escalate urgent issues that may affect safety, quality, programme or asset integrity. • Liaise with site teams, supervisors, engineers, planners and subcontractors to coordinate access, clarify findings and support close-out of actions. • Maintain a safe system of work and comply with site rules, permits, risk assessments and relevant health, safety and environmental requirements.
Work covers four developments in the highland and Moray district. The main body of work will comprise of painting the common areas and handrails at the development. Each development may have additional works. Please see the specifications and drawings provided with this tender, along with the pricing schedule. These development are listed as follows: Coppice Court, Grantown-on-Spey (External/Internal) Woodside Court, Grantown-on-Spey (External/Internal) Batchen Court, Forres (External/Internal) Cameron Court, Forres (External/Internal).
Elvetham Heath Parish Council invites tenders from suitably qualified and experienced contractors to extend an existing multi-use games area (MUGA). This includes the supply and install of a double-sided heavy duty basketball and goal mouth, a 15m double-sided rebound wall, tarmac surfacing, associated groundworks, edging, markings and reinstatement. Security fencing is required for the duration of the project. Please email or post tender documents to Suzanne.Pepper@elvethamheath-pc.org.uk or Suzanne Pepper, EHPC, The Key Centre, The Key, Elvetham Heath GU51 1HA