Skip to content

This bid has closed.

Responses were due Aug 18, 2026. Similar open opportunities are listed below — or get alerts when work like this posts again.

SAM.govClosed

NIST Boulder Solar Lighting Upper Site Replacement

Electrical
Location
Boulder, United States
Responses due
Aug 18, 2026

Overview

11 AUG 2026 - Published AMD 0004 RFI and extend due date 6 AUG 2026 - Published AMD 0003 Minor changes to Instructions and Evaluation. 4 AUG 2026 - Published AMD 0002 inc rfis and minor changes. Added Site visit attendance sheet The National Institute of Standards and Technology (NIST) Boulder Campus seeks a qualified contractor to replace aging solar-powered exterior pole luminaires with new hard-wired LED pole luminaires throughout selected areas of the campus. Work includes demolition and removal of existing solar lighting systems, design and installation of new pole bases and luminaires, photometric analysis, structural pole base design stamped by a licensed Colorado Professional Engineer, and installation of new electrical circuits originating from nearby building panelboards. Construction activities include trenching, backfilling, restoration of landscaped and hardscaped areas, equipment labeling, and coordination of electrical shutdowns. All work must comply with NEC, NIST site standards, and applicable safety and security requirements. Important Dates: List of Individuals Attending Site Visit Due: Friday, July 17, 2026 to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov Site Visit: Tuesday, July 21, 2026 @ 1:00pm at Building 25 Questions Due: July 30, 2026 @ 5:00pm to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov Proposals Due: August 13, 2026 @ 5:00pm to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov

Source: SAM.govView in Constructeams

Similar open bids

SAM.govCloses today

Fiber Optic Network Rebuild

Amendment 5. The purpose is to extend the proposal due date to Monday, September 28, 2026 at 12:00 noon, MTN. All other terms and conditions remain unchanged. -------------------------------------------------------- See Amendment 4. All other terms and conditions remain unchanged. _______________________________________________________________________________ The purpose of this Amendment 3, is to extend the proposal due date from September 21, 2026 to Friday, September 25, 2026. A mandatory site visit is scheduled for Wednesday, September 23, 2026 from 9:00am – 11:00am MTN. Questions from the site visit should be submitted no later than Thursday at 9:am MTN to be posted by Thursday at 2:00 PM MTN. Meet at the West gate to Table Mountain is located at 8600 N. 39th Street, Longmont, CO 80503. All other term and conditions remain the same. --------------------------------------------------------------------------------------------------------------------------------------- The purpose of Amendment 2 is to clearly state the proposal due date of Monday, September 21, 2026. Post Questions and Answers. All other terms and conditions remain unchanged. ------------------------------------------------------------------------------------------------ The purpose of Amendment 1 is to correct the dates in the RFQ. All other terms and conditions remain unchanged. ------------------------------------------------------------------------------------------------------------------------------- This is a small business set aside for Fiber Optic Newtowrk Rebuild. Please see attached documents.

LongmontElectrical
Due Sep 28, 2026View bid
SAM.govCloses today

Schriever Cyber Threat Intelligence Software

PRESOLICITATION NOTICE Solicitation Number: FA255026Q0060 Notice Type: Presolicitation SOLICITATION TYPE: This is a sole source acquisition under RFO 6.103-1 (Only One Responsible Source) and 10 U.S.C. 3204(a)(1) CONTRACTING OFFICE: Department of the Air Force 50th Contracting Squadron, PKB 210 Falcon Parkway, Suite 2116 Schriever Space Force Base, Colorado 80912 POINT OF CONTACT: Name: Alejandro Castellanos Email: alejandro.castellanos@spaceforce.mil Phone: 719-567-6185 NAICS CODE: 541511 NAICS SIZE STANDARD: $34M PRODUCT SERVICE CODE (PSC): DJ10 SET-ASIDE: None – Sole Source Acquisition DESCRIPTION OF REQUIREMENT: The Department of the Air Force intends to award a sole source contract to Argonne Ridge Group, LLC for Augury Platinum software for Schriever Space Force Base. This requirement includes the following services: 1. Global Netflow Analytics & Threat Tracking Netflow Telemetry Querying: Provide access to a massive, global network flow database with the ability to run targeted queries on source/destination IP addresses, ports, protocol types, packet counts, and timestamps. Threat Infrastructure Tracking: Enable analysts to trace malicious command and control (C2) servers, map botnets, analyze hostile infrastructure, and perform forensic attribution. Passive DNS & IP Reputation: Integrated access to historical passive DNS databases and IP threat scores to quickly context-resolve suspect nodes. Encrypted Traffic Profiling: Capabilities to identify and analyze anomalous traffic patterns and identify threat actors utilizing virtual private networks (VPNs) or encrypted tunneling. 2. System Access & Seat Allocation License Tier: Platinum level subscription. User Capacity: 15 dedicated user licenses (seats) for cyber defense analysts. Secure, web-based software platform with 24/7/365 availability. API endpoints for integrating intelligence feeds directly into the unit's local security tools, Security Information and Event Management (SIEM) systems, or data orchestrators. 3. Operations & Maintenance Support Software Updates: Ongoing platform upgrades, database maintenance, search engine optimization, and feature additions throughout the performance periods at no extra cost. Technical Support: Helpdesk and administrator support for user troubleshooting, configuration assistance, and platform optimization. Up to three training sessions are available with Augury subscriptions. CONTRACT TYPE: Firm-Fixed-Price PERIOD OF PERFORMANCE: Base Year: Sep 30, 2026 To Mar 29, 2027 Option Year 1: Mar 30, 2027 To Jun 29, 2027 Option Year 2: Jun 30, 2027 To Sep 29, 2027 Option Year 3: Sep 30, 2027 To Sep 29, 2028 Option Year 4: Sep 30, 2028 To Sep 29, 2029 SOLE SOURCE JUSTIFICATION: This acquisition is proposed on a sole-source basis to Argonne Ridge Group, LLC, under the authority of RFO 6.103-1, Only One Responsible Source, and 10 U.S.C. § 3204(a)(1). Augury is currently integrated into Mission Delta 6’s operational baseline through prior work performed with U.S. Space Command. As a result, Augury represents the only known capability that is presently integrated and available to support the requirement without additional platform-validation, integration, security, and sustainment efforts. Award to Argonne Ridge Group, LLC would avoid the cost, schedule impact, and operational risk associated with modifying the current infrastructure; conducting additional demonstrations and security assessments; integrating a new platform; migrating data and workflows; and training personnel on a replacement capability. These additional efforts would delay fielding of a needed capability and introduce unnecessary cost and risk to the Government. A Sources Sought notice, FA255026AC002, was posted on SAM.gov on 21 September 2026 for three days to identify other software platforms capable of meeting the requirement. Although market research identified other potentially similar capabilities, the responses did not demonstrate that any alternative platform is immediately deployable and fully compliant with Mission Delta 6 requirements. Specifically, the alternative submissions contained unresolved gaps related to material capability validation, data sources and retention, integration methods, security boundaries, hosting, application programming interface specifications, service-level agreements, and sustainment. Further demonstrations, technical assessments, and integration efforts would be required before the Government could determine whether those platforms satisfy the requirement and can be integrated into Department of the Air Force Department of Defense Information Network systems. Argonne Ridge Group, LLC is the only known responsible source capable of providing the required Augury capability to meet the Government’s immediate operational need. ANTICIPATED SOLICITATION ISSUANCE DATE: On or about 28 Sep 2026. RESPONSE TO THIS NOTICE: This is a presolicitation notice only. No quotes or proposals are being requested at this time. A solicitation will be issued directly to Argonne Ridge Group, LLC as the sole source contractor. This notice is being posted to satisfy the requirements of RFO 5.101 for acquisitions using the authority at RFO 6.103-1. Interested parties may submit capability statements or information relevant to this requirement; however, this is a sole source acquisition and the Government does not intend to award to any other contractor.

Colorado Springs
Due Sep 28, 2026View bid
SAM.govCloses today

Buckley SFB - BDOC Chiller Replacement

AMENDMENT 4: The purpose of Amendment 4 is to update the SOW (CAO 25 September 2026), provide the MTA TAEevo Tech Guide Specifications sheet and extend the quote submission deadline. The SOW has been updated to require the furnishing and installation of two (2) MTA TAEevoTECH 121 air-cooled scroll chillers (complete with integrated pump, on-board buffer tank with immersed evaporator, closed expansion tank, and factory-installed modularity kit) compliant with MTA Guide Specifications. Equipment shall comply with all performance, construction, and accessory requirements outlined in the MTA Guide Specifications and Product Literature. The new quote due date is 28 September 2026 at 1600 MDT. All offerors who submitted quotes prior to this amendment are required to resubmit their final quotes to the CO/CS. AMENDMENT 3: The purpose of Amendment 3 is to update the Statement of Work (SoW), release the current chiller submittal document, publish the questions/answers that were submitted to the CO/CS on or before 3 September 2026, and to extend the quote due date to 22 September 2026 at 1500 MDT. Any quotes that were submitted before this amendment should be resubmitted to the CO/CS. AMENDMENT 2: The purpose of Amendment 2 is to extend the quote due date to 18 September 2026. This date is currently a placeholder while questions received are being answered. When questions are answered and posted as another amendment, the due date will be updated to the official quote due date and time. AMENDMENT 1: The purpose of Amendment 1 is to extend the quote due date to 15 September 2026. This date is currently a placeholder while questions received are being answered. When questions are answered and posted as another amendment, the due date will be updated to the official quote due date and time. Buckley SFB requires the replacement of an existing chilled water system and two (2) computer room air handlers (CRAHs). The new chiller system must be Trane-series equipment IAW Air Force Civil Engineering installation standarization guidance. Please see the attached Statement of Work for further details A formal site visit will be held on at Buckley SFB on Tuesday, 1 September 2026 at 1330 MDT. This site visit will allow prospective offerors the opportunity to inspect the site and assess the conditions relevant to the performance of this requirement. Attendance of this site visit is highly encouraged for all prospective offerors. The contractor shall provide the names of all members attending the site visit to the Contracting Officer and Contract Specialist by 1000 MDT Monday, 31 August 2026. Contractors should limit attendance to no more than 3 members from each company. Any contractor attending the site visit will need to be sponsored onto the base at the visitors center prior to the site visit starting, and should arrive in time to be sponsored prior to the 1330 MDT site visit start time (NLT 1230 MDT). This will serve as the only site visit for this requirement/solicitation. Questions following the site visit will be due to both the Contracting Officer and Contract Specialist by 1000 MDT, 3 September 2026. Quote submissions will be due to both the Contracting Officer and Contract Specialist by 1000 MDT, 9 September 2026. Quotations received after the submission may not be answered or accepted. Due to end of fiscal year funding constraints, the Government does not intend on extending the quote deadline past this date/time.

AuroraPlumbing · HVAC Mechanical
Due Sep 28, 2026View bid
SAM.govCloses today

1 FW Network Install

**Please reread requirement documents because solitication has been amended and updated. SOR has been updated to reflect minor changes.** This SOW requires a contractor to provide a turnkey installation of rotating blue-beacon alert lights and a secure 4K CCTV system at a 1st Fighter Wing facility at Joint Base Langley-Eustis. The work includes furnishing all needed labor, equipment, CAT6/fiber cabling, non-wireless cameras and monitors, and integration with existing conduit, push-button boxes, and a CCTV equipment rack. Physical Address: 196 E. Flightline Road, B. 749 Hampton, VA Responses to this solicitation are due by 28 Sept at 1200 EST. Email quotes to Sigourney Rosario at sigourney.rosario@us.af.mil AND Elizabeth Adriatico at elizabeth.adriatico@us.af.mil. Vendors may submit questions regarding clarification of solicitation requirements to Alyson Moore at alyson.moore.1@us.af.mil and Sigourney Rosario at sigourney.rosario@us.af.mil by 24 Sept at 1600 EST. Any questions received after this date may not be answered.

Langley AFBElectrical
Due Sep 28, 2026View bid
SAM.govCloses today

Council Bluff Primary Electric And Well Improvements

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LT26Q0172 is issued as a Request for Quotation (RFQ) for MARK TWAIN NATIONAL FOREST COUNCIL BLUFF PRIMARY ELECTRIC AND WELL IMPROVEMENTS. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 283210. The small business size standard is $19 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The Work consists of coordinating with Ameren to extend their existing primary electric line from an overhead power line located near Missouri State Highway DD to the Wild Boar Campground. This includes coming off an existing electric pole on the east side of the highway and installing buried line along the edge of the cleared highway right-of-way to the existing well within the Council Bluff Recreation Area. The corridor will parallel the east side of Missouri State Highway DD for approximately 9,600 feet and then use an “old road corridor” along the top of Wild Boar Ridge leading to the well for approximately 3,100 feet.

RollaElectrical
Due Sep 28, 2026View bid
SAM.govCloses today

FA445226R0018_43d AMOG Carpet Repair_Request for Proposal

Amendment 03 was added to update "Amendment02Attachment 4_Price Proposal" and to add the Questions and Answers to the Site Visit. Amendment 02 was added to provide an update to SOW and an updated appendix A. This is a formal Request for Proposal (RFP) for commercial construction services prepared in accordance with Revolutionary FAR Overhaul (RFO) 12.201, in conjunction with RFO Part 36 procedures. This effort is being competitively solicited as a 100% small business set-aside under NAICS code 238330, Flooring Contractors with a small business size standard of $19.0 Million. This RFP is for the subject project to be awarded in accordance with RFO Part 12 and Part 36 procedures and the specific instructions outlined within this RFP and its attachments. The Government intends to award a single firm-fixed-price purchase order for the subject requirement.

Pope Army AirfieldFlooring
Due Sep 28, 2026View bid