Manchester International Airport - OLE Phase 3 Works
Civil- Location
- Clippers Quay, England, United Kingdom
- Responses due
- Oct 9, 2026
- Budget
- £2,500,000 (est.)
Overview
Source: Contracts Finder (UK)View in Constructeams
Source: Contracts Finder (UK)View in Constructeams
The Lower Thames Crossing Roads, North Programme is seeking expressions of interest from suppliers with experience in reinforced concrete (FRC) and structural works. The scope is expected to include elements such as reinforced concrete foundations, abutments, retaining walls, pile caps, reinforced earth structures, bridge structures and other civil engineering works. As part of our procurement planning, we are considering a range of packaging options, including splitting the works into multiple packages. Through this PQQ, we are looking to better understand the market's capability, capacity and preferred delivery models to help inform the final procurement strategy. What We're Looking For We would like to hear from organisations with experience in one or more of the following: Reinforced concrete foundations Reinforced concrete abutments Reinforced concrete retaining walls Reinforced earth structures Pile caps and substructures Bridge and highway structures Structural concrete works Civil engineering and infrastructure projects Design, construction, supply and installation services Temporary works design and management Quality assurance, testing and commissioning We welcome responses from organisations of all sizes, including SMEs, either independently or as part of a consortium, joint venture or wider supply chain arrangement. How to Apply If you are interested in this opportunity, please complete the attached FRC Structures Package Eligibility Criteria Questionnaire and return it to the Supply Chain Team by 14.10.26 at: BBLTCProcurementandSupplyChain@balfourbeatty.com Please ensure all sections of the questionnaire are completed, as this will help us gain a full understanding of your organisation's capabilities, capacity and experience. The qualification questions have been designed to assess your ability to meet Balfour Beatty and Lower Thames Crossing supply chain requirements and will help inform the final packaging strategy for these works. As we are currently considering a number of packaging options, including smaller and specialist work packages, we are particularly interested in understanding the scale of work your organisation can deliver, your technical capabilities and your preferred delivery model. Additional information: The Lower Thames Crossing (LTC) is a new road to better connect Essex and Kent through a tunnel beneath the River Thames. Our purpose is to drive a change in how we deliver - connecting people to jobs and businesses to opportunities, leaving a skills legacy for the local community and construction industry, all whilst restoring nature and drawing a new blueprint for low-carbon construction. Our ambition is to deliver the UK's greenest road, and to do the right thing for local communities and the environment. We can only achieve this with the support of our supply chain, and it is therefore critical that for any supplier to be successful in winning work on LTC, they must demonstrate commitments to supporting delivery of our ambitions: • Delivering the works through a 'zero emissions' solution, and not using diesel on site in any plant or machinery. • Supporting us to leave a skills legacy for the local community, by not only recruiting locally, but upskilling your workforce to enable meaningful progression into higher paid higher skilled work. • Helping to facilitate successful opportunities by providing early careers roles, as well as inspiring young people into construction through delivery of STEM engagement.
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements.
Significant repairs to the public hard surface areas on the un-adopted highway within the Colchester Borough.
Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of both non intrusive and intrusive surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. The work scope is the supply of Explosive Ordnance Clearance(EOC) Engineer Site Surveys to support intrusive activates when work is completed within Medium or High Risk UXO (Unexploded Ordinance) Areas.
Chemonics Group UK Limited which is implementing the Partnership Fund for a Resilient Ukraine Phase 2 (PFRU-2) Project as part of international technical assistance (hereinafter referred to as Chemonics) invites you to submit a Tender for Procurement of Facility Maintenance, Fluid-Handling and Food-Service Equipment
Advance Northumberland (Developments) Limited, trading as Advance Northumberland (Developments) Ltd requires a Roads & Sewers sub-contractor for our new build housing development consisting of 57no new build plots in Coulson Park, Ashington, Northumberland. All tender documentation can be found on the ProContract Portal