Bid Board
1,052 live construction bids & tenders
Open opportunities from government portals across the US, UK, and Canada — plus projects posted by contractors on Constructeams. Filter by trade and location, then connect bid activity back to your workspace. Free to browse; create a free account to save searches, respond, and get alerts.
FM 1925 - Seal Coat (2027)
Seal Coat
FM 1021, 1229-01-083 SEALCOAT
RESURFACE OF EXISTING ROADWAY SEALCOAT AND PAVEMENT MARKING
SEAL_COAT_27_US385_PECOS_COUNTY
FY 27 Seal Coat
FM 490 - Seal Coat (4)
Seal Coat
FM 494 - Seal Coat
Seal Coat
FM 2687 - Seal Coat
Seal Coat
SEAL_COAT_27_FM_1216
FY 27 Seal Coat
SEAL_COAT_27_RM2886_IH10NFR_TERRELL_CL
FY 27 Seal Coat
SC | FM 1240 | SH 6 to FM 2603
Seal Coat
BU 287J From City View Dr to SL 11 WFR
ADA remediation, pedestrian bridges on north side of BU 287J
PHR_SH495_FY24
Install Sidewalk
FM 117, 0236-03-029 SEALCOAT
RESURFACE OF EXISTING ROADWAY SEALCOAT AND PAVEMENT MARKING
SC | FM434 | McLennan CL to Br of Cow
Seal Coat
SC | BU 190J | 190 | 190
Seal Coat
CR 268 BRIDGE REPLACEMENT 2711
Replace Bridge and Approaches
2484-01, FM 395 SC
RESURFACE OF EXISTING ROADWAY SEALCOAT AND PAVEMENT MARKING
FM 1925 - Seal Coat
Seal Coat
FM 1847 - Seal Coat
Seal Coat
FY 2027 Guardrail
REPLACE AND/OR UPDATE GUARDRAIL ON VARIOUS ROADWAYS WITHIN FORT WORTH DISTRICT
Sealcoat FM65, 0652-01
SEALCOAT OF EXISTING ROADWAY CONSISTING OF PAVEMENT SEALING, AND PAVEMENT MARKING
1937-02, FM 393 SC
RESURFACE OF EXISTING ROADWAY SEALCOAT AND PAVEMENT MARKING
Y1DA--Replace Air Handling Units in Building 42
.
SIDEWALK REPAIR PROGRAM PACKAGE NO. 86 (LA 28)
This is a Design-Bid-Build construction project to remediate existing pedestrian facilities and bring them into compliance with current Americans with Disabilities Act (ADA) standards at 57 sites: 49 Access Request Sites and 8 LA28 Program Access Improvements (PAI) sites. The scope of work includes sidewalk, driveway, curb and gutter replacement; curb ramp installation; asphalt concrete patch repair; concrete intersection gutter repairs; tree removal, planting, canopy trimming, and root pruning; landscape restoration; removal and replacement of roll gate and track; adjustment of utility boxes and vaults to grade; and removal and reinstallation of water meters. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
Central Business District (CBD) Sewer Rehabilitation Unit 12 - Alameda Street to 18th Street (Re-Bid)
The scope of work consists of rehabilitating approximately 6,387 feet an existing 40-inch circular brick sewer by Ultraviolet Cured In-Place Piping (UVCIPP). Most of the rehabilitation work is expected to be performed by access through existing maintenance holes. The scope of work also includes rehabilitation of 20 maintenance hole structures which include 4 junction structures, top 6-ft. of all maintenance holes shafts will be removed and reconstructed with 30-inch frames and covers. The project entails the cleaning, removal and disposal of the fallen bricks and other debris, preparing the sewer for UVCIPP liner installation, re-establishing lateral sewers and house connections. Temporary odor control, sewer bypass, and traffic control are also parts of the scope of work. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/