Bid Board
1,473 live construction bids & tenders
Open opportunities from government portals across the US, UK, and Canada — plus projects posted by contractors on Constructeams. Filter by trade and location, then connect bid activity back to your workspace. Free to browse; create a free account to save searches, respond, and get alerts.
US 77 from 1.4 mi N to .57 mi S of SH 21
FDR, LEVEL UP AND TOM
US067 SC (15 MI S JCTUS67/90 | 33 MI S)
SEAL COAT
Brownwood Area Thermo Striping FY2027
THERMOPLASTIC STRIPING
FM 306: 1728-02-069; SFT
Install Continuous Turn Lane
US 180 ALBANY TOWN SECTION
OVERLAY
SS 325 CTB
Add CTB along segments of SS 325
HSIP_FM866_SafetyLightingTurnLanes
SAFETY LIGHTING, ADD LEFT TURN LANE, ADD RIGHT TURN LANE
US 190-@ CANEY CREEK RELIEF-BRIDGE MAINT
US 190-@ CANEY CREEK RELIEF-BRIDGE MAINTENANCE (STR 201760024405042)
FM 576 MORAN TOWN SECTION 1031-05
OVERLAY
FM 1416 (FM 2460 to SH 87) OVERLAY
FM 1416 (FM 2460, SOUTH to SH 87) OVERLAY
VA Freestone County - Backplates FY 27
Install Reflectorized Backplates
CR 2065_At Hurricane Byu Rel - HBP
Replace Bridge and Approaches
FM 1876, Bellaire Bvd to Old Richmond Rd
Milling, Seal Coat, Overlay, Pavement Markings, and Widening to make the Northbound lanes 12 feet wide (No added capacity)
PEBBLE HILLS (KLEINFELD | KINGS CREST)
IMPROVE TRAFFIC SIGNALS, IMPROVE SCHOOL ZONE, DYNAMIC SPEED FEEDBACK SIGNS, INSTALL PAVEMENT MARKINGS
Z--CABLEWAY CRANE REFURBISHMENT
Cableway Crane Refurbishment - Hoover Dam
ADVANCE PROCUREMENT NOTICE - NORAD NORTHERN BASING INFRASTRUCTURE
Advance Procurement Notice NORAD NORTHERN BASING INFRASTRUCTURE (NNBI) DEPLOYED OPERATING BASE (DOB) GOOSE BAY (with Security Requirements) Purpose of this Advance Procurement Notice This is not a request for proposals. In the context of the major investments announced by the Government and to foster a proactive partnership with industry, DCC is issuing this Advance Procurement Notice (APN) to inform Design-Builders of an upcoming contract opportunity at the Deployed Operating Base Goose Bay, NL. The purpose of this APN is to allow Design-Builders to assess their capacity and interest in participating, and to prepare adequately for the potential solicitation process, notably by initiating any necessary steps. This is a preliminary notice regarding a potential contract, which includes security requirements. The purpose of this APN is to allow interested Design-Builders to initiate, if required, the sponsorship process to obtain the necessary clearances or security clearances (if applicable). Please note that there is no guarantee that this contract will proceed or that security clearances will be granted within the anticipated timelines or at all as part of the sponsorship process. Description of the Project and Services The Department of National Defence (DND) is investing in infrastructure developments for the North American Aerospace Defence Command (NORAD) Modernization and Continental Defence at the Deployed Operating Base (DOB) Goose Bay (5 Wing Goose Bay), located in Happy Valley–Goose Bay, Newfoundland and Labrador. This infrastructure investment aims to ensure that the Canadian Armed Forces (CAF) have the tools they need to achieve their security and sovereignty objectives. These improvements will enable advanced aircraft operations and quick mobilization in the North for NORAD missions. The infrastructure requirements for the DOB Goose Bay (5 Wing Goose Bay) will include the following but are not limited to: • Airfield improvements; • Hangars with aprons and taxiways; • Ammunition compounds; • Fuel facilities; • Accommodations, warehousing, planning, multi-purpose facilities, and support equipment; • Robust IT, Cyber, and Logistics infrastructure. Areas for Elements in GB for the various facility components are as follows. Approximate Areas for Elements in GB Total hangar space - 40,000 m2 Ops Centre - 1,000 m2 Munitions Storage - 600 m2 Security Force Facility - 1,000 m2 Accommodations - 5,000 m2 Admin & Storage facilities - 11,500 m2 Aprons & Taxiways (Rehabilitation/Resurfacing) - 615,000 m2 Aprons & Taxiways (New) - 225,000 m2 Runways (Renewal/Resurfacing) - 275,000 m2 Roads - 50,000 m2 Fire Hall - 2,000 m2 Note: these Areas for Elements are approximate and will be validated further as the project develops. The delivery method for this infrastructure will be a Modified Design Build (MDB) contract, with one MDB contract for the site and an estimated total contract value that may exceed $5B. This multi-year contract consists of the following sequential and/or concurrent phases and are not limited to: • Requirements validation, concept development, market analysis and planning activities. • Design Phase activities. • Construction Phase activities. It is anticipated that the Request for Proposal (RFP) will include detailed evaluation criteria; however, these remain subject to change and will be finalized and fully described in the RFP documentation upon release. At a high level, it is expected that the RFP will assess proponents on demonstrated experience across a range of factors, including northern design and construction experience, experience delivering similar asset types (both within and outside of northern environments), and the integration of design and construction capabilities within a single team. Key personnel requirements will include demonstrated northern experience for certain roles. The evaluation of approach and methodology is expected to consider how proponents plan to successfully deliver projects in northern environments, including logistics, climate, and constructability considerations, as well as their approach to Indigenous participation based on principles of meaningful participation and mitigation of potential adverse effects. In addition to the technical evaluation, a formal interview process will be conducted to further assess team capability to successfully deliver the project in a northern environment. The terms and conditions of the contract will allow for self-performed work by the design-build team. The infrastructure work for Goose Bay is projected to be procured in February 2027. This is conditional on receiving approval to proceed by DND. The Government of Canada is committed to advancing reconciliation and fostering meaningful engagement with Indigenous Peoples. In support of these commitments, DND aims to create opportunities for Indigenous businesses and communities through meaningful subcontracting, employment, and training related to the proposed project. To align with these objectives, the successful proponents will be required to develop an Indigenous Benefits Plan (IBP) as part of the MDB contract. The IBP will outline proposed initiatives and opportunities for Indigenous participation, including subcontracting, employment, and training activities. Contract Award and Anticipated Security Requirements To be eligible for contract award, a Design-Builder will be required to, among other things, actively hold or obtain all required security clearance(s) prior to the date of the award, as further detailed in the solicitation documents. The anticipated security clearance level for this contract is Facility Security Clearance at the level of SECRET Industrial Security Program Sponsorship Defence Construction Canada (DCC) is providing Design-Builders early access to the security clearance application process through sponsorship under its Industrial Security Program (ISP). Accordingly, Design-Builders that intend to submit a proposal for this project and that do not actively hold the above identified security clearance(s) should begin forthwith the security clearance application process by applying through DCC’s ISP. Under this program, DCC may, at its entire discretion, provide preliminary assistance to all the potential proponents with their respective security clearance sponsorship process. To begin the security clearance sponsorship process, please submit a sponsorship request application to DCC by following the steps identified on DCC’s website at: https://www.dcc-cdc.gc.ca/industry/security-requirements. In their sponsorship request application to DCC, design-builders are asked to quote the following information, among other things: Advance Procurement Notice (APN) number (Project number on the MERX notice); Contract number 87054; and Level of clearance requested to be sponsored for. Sponsorship Process Upon receipt, DCC will review the sponsorship request application and will communicate directly with the Design-Builders to provide assistance for the completion of the sponsorship request packages Once DCC has determined, at its entire discretion, that a Design-Builder: has started the sponsorship process prior to the solicitation (Contract number listed on their request for sponsorship) being advertised on MERX, has met all the material requirements of the sponsorship request package, and has submitted a proposal or a bid DCC will send the documents to the Public Services and Procurement Canada’s (PSPC) Contract Security Program (CSP). Following receipt of the sponsorship request package, the CSP will communicate directly with the proponent regarding any further steps or actions to be undertaken or the status of the sponsorship request package processing. At such time, the proponent will need to promptly cooperate with CSP to ensure that the process is completed as soon as possible. Questions Any questions pertaining to the sponsoring process through the ISP can be addressed to: Telephone Number: (613) 998-8974; or Email address: ISP.Sponsorship@dcc-cdc.gc.ca Any questions relating to this Advance Procurement Notice can be addressed to: Gary Fulton Leader, Contract Services Defence Construction Canada 782-640-1049 Gary.Fulton@dcc-cdc.gc.ca Disclaimer DCC is only providing assistance, at its entire discretion, for the above stated sponsorship process and does not provide any representations or guarantees that a sponsorship request package or a security clearance application forwarded by DCC to the CSP will be successful or result in the granting of the requested security clearance(s) by the CSP. At all times, the processing of a sponsorship request package or a security clearance application is subject to the respective terms, conditions, and timelines of DCC’s ISP sponsorship process and the CSP security clearance granting process. By applying to either of the aforementioned processes, the proponent agrees to bear any fees and risks associated with: (i) the completeness or accuracy, or lack thereof, of its application or related documents submitted under or in connection with either said processes, and (ii) the timeliness, or lack thereof, of any processing or granting of security clearance(s) under or in connection with either said processes. Notwithstanding anything else stated above, DCC shall in no event be liable to the proponent for any direct, indirect, incidental, special, consequential, punitive or exemplary damages arising out or in connection with the above stated sponsorship process. Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.
FOX-A and FOX-1 Remediation Construction
Please note that late submissions will not be considered or accepted. A Letter of Interest is a public notice indicating to the supplier community that a department or agency intends to solicit proposals for a contract for goods, services or construction, thereby allowing proponents to signal their interest in participating in a site visit or in submitting a proposal. Public Services and Procurement Canada (PSPC), on behalf of Crown Indigenous Relations and Northern Affairs Canada (CIRNAC) is issuing a notice of optional pre-tender site visit and intended procurement for the remediation of the FOX-A and FOX-1 Sites on Bray Island and Rowley Island, Nunavut.
Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of Oahu
DLA Energy, in conjunction with the United States Army, plans to offer the privatization of the Water distribution (NAICS 221310) utility system at U.S. Army Garrison-Hawaii, Island of Oahu. Utilities Privatization (UP) is defined as the transfer of ownership and responsibility to a municipal, private, regional, district, or cooperative utility company or other entity, for the operations, maintenance, repair, future upgrades, and future utility systems replacements. The conveyance may consist of all right, title, and interest of the United States in the utility system. UP will be accomplished in accordance with 10 U.S.C. §2688 – Utility Systems: Conveyance Authority. As a result of this solicitation, the Contractor(s) will be selected to assume ownership of the Water utility system. The new owner(s) shall operate and maintain the system and provide utility services to the Government. Any resulting contract, if awarded, will require the Contractor to furnish all facilities, labor, materials, tools, and equipment necessary to own, maintain, and operate the utility system. All responsibility for maintaining reliable service, including such items as environmental compliance, maintenance costs, major system renovations, construction, equipment, manpower, and overhead costs shall become the utility system owner’s responsibility. The Contractor shall manage the maintenance, repairs, replacement, etc., of the system to ensure continuous, adequate, and dependable service for each Government or tenant connection within the service area. The Contractor shall be responsible for funding all capital investments required to acquire, maintain, and operate the utility system in a safe, reliable condition and to meet the requirements listed in the contract. Real property interests will be conveyed in the form of a Right to Access or an Easement as a reference to the resultant contract. The utility system will be conveyed via a Bill of Sale after a transition period to be determined by the Contractor. Past performance information from potential offerors shall be submitted as directed in the solicitation. A Sources Sought Notice for this requirement was previously publicized under solicitation number SP060026R0813 on May 29, 2026. The Sources Sought Notice has closed and market research is complete. This requirement will be unrestricted. All responsible sources are encouraged to submit an offer. Other-than-small businesses are required to submit a subcontracting plan with their offer. Interested sources may contact Jonathan Moore, Contracting Officer at jonathan.moore@dla.mil, Timothy Stark, Contracting Officer at timothy.1.stark@dla.mil, Nikki Rooksby, Contract Specialist at nikki.rooksby@dla.mil, or Lexy Sweitzer, Contract Specialist, at lexy.sweitzer@dla.mil to be added to our offeror mailing list. Secure Documents As this requirement will be an unrestricted, competitive action, several of the solicitation documents will be posted as “secured” on the SAM.gov Contract Opportunities website. In order to view those documents, vendors will need to obtain special access. The process of obtaining access is somewhat lengthy, therefore all interested vendors are encouraged to begin that process as soon as possible. Instructions for obtaining access are provided below. Should any party have issues with obtaining access to SAM.gov or the secure documents, they must notify the contracting office no later than September 29, 2026. Notifications to the contracting office of the inability to access secure documents after that suspense will not be a consideration in extensions to the Request for Proposal date. To ensure all parties are able to retrieve secure documents for this solicitation, a test document has been placed under secure package: SP060026R0813. Instructions for access to the Contract Opportunities Controlled Site To access the controlled, but unclassified, documents in the SAM.gov system, Offerors are required to be registered in SAM.gov. A CAGE Code and Unique Entity Identifier (UEI) are created through the SAM.gov registration process at https://sam.gov/. Offerors must create a login.gov account in SAM.gov. Instructions are below. For additional help, contact the Federal Service Desk at www.fsd.gov or toll free at 1.866.606.8220. To link to an existing login.gov account From https://sam.gov/ go to sign in on the toolbar. Enter an email address and password for the existing login.gov account. Offerors will then receive an email to associate the existing login.gov account with SAM.gov. Offerors will now use this login.gov account to sign into SAM.gov. New users will be asked to complete their SAM.gov profile. To create a new login.gov account From https://sam.gov/ go to sign in on the toolbar. Select create an account. Enter an email. Offerors will receive a link with a security code via email. Go to the link and enter that security code and press continue. Create a password. Press continue. Select the method to receive one-time security codes in the future. Note: The recommended method is Text message/SMS. As part of the registration process, Offerors will be prompted to select a second authentication method. Once the login.gov user account is created, sign in at SAM.gov and navigate to the solicitation using the “Search Contract Opportunities” link. Click on a controlled attachment to initiate the request for access. A message will appear stating “You are not on Authorized Parties List. To get added to the Authorized Parties List Contractors must submit form DD2345 or you can request for Request access.” Enter a “Reason for Access” and click Submit. Offerors will be notified of the response to the request. Please note that Offerors will now need to request access for each attachment individually. Offerors that already have Joint Certification Program (JCP) certification are encouraged to verify its information in the JCP system at https://www.public.dacs.dla.mil/jcp/ext/. Incorrect information may result in rejection of request and delays in access to controlled documents. Instructions for obtaining JCP certification or for correcting a current JCP certification are as follows: Applicants for JCP certification are required to have an updated and correct SAM.gov registration, UEI, CAGE Code, and login.gov account. Applicants for JCP certification are required to complete a NIST assessment and upload it to SPRS. NIST assessments are valid for 3 years, must be documented in SPRS, and must be current more than 90+ days. Applicants must review and completion the Introduction to Proper Handling of DoD Export-Controlled Technical Data through https://www.dla.mil/Logistics-Operations/Services/JCP/. All applications must be completed through the JCP Portal. The portal may be accessed through https://www.dla.mil/Logistics-Operations/Services/JCP/ or directly at https://www.public.dacs.dla.mil/jcp/ext/. Click the Registration link below the Login button to navigate to the Registration page. Register either with a username and password. The Register – User Name and Password page is for use by users not in possession of a Government Common Access Card (CAC). All JCP Portal users logging in with a username and password must enable Two Factor Authentication (TFA) on the JCP Portal account. Log in to the JCP Portal account with the username and password. A prompt requires the TFA set-up on the account. Set-up Google Authenticator on a smartphone. Google Authenticator will be used upon each log in attempt. Either scan the QR code in the Google Authenticator application or manually enter the verification code. Select verify and save. After registering, click Profile in the header of the main page. To update your Profile information (First Name, Last name, Email, or Telephone), make a change in any or all the form fields and save by clicking the Save button. Upon first login after registration, an organization will not be attached to the profile. The Dashboard page will display an Actions drop down in the upper right corner. Click either Request to Join an Organization or Create New Organization. Applicants will complete the DD Form 2345, Military Critical Technical Data Agreement, through the JCP Portal. Notify the DLA Energy Solicitation POCs of the request submission together with company name and CAGE Code used on the request form. The JCP office will contact the Offeror with additional instructions. JCP will return an approved and signed certified form, which will include the certification and expiration date. For assistance with the DD2345 or to inquire about the acceptability of providing documentation electronically, please contact the U.S./Canada Joint Certification Office, DLIS: U.S./Canada Joint Certification Office Logistics Information Services Federal Center, 74 Washington Ave., North Battle Creek, Michigan USA 49037-3084 Phone: 877-352-2255 E-mail: JCP-Admin@DLA.MIL Once approval is received, it can take up to 24 hours for the JCP information to reach all systems. Once Offerors receive the approved DD2345 from JCP, have verified the status, and have verified that all information is correct and matches the SAM registration for the same CAGE Code at https://www.public.dacs.dla.mil/jcp/ext/, follow the steps for requesting access to controlled documents in #3, above. All JCP account registrants must log in to the JCP Portal at least every 35 days to keep their accounts active. Accounts not active past 35 days will be disabled. A warning email from j62.dacs@dla.mil will be sent five (5) days and then one (1) day prior to your account being locked. If you find that your account is locked/disabled, please go to the DACS Portal: https://www.public.dacs.dla.mil/portal/ and click the "Unlock Account" link. You will need to provide your username and email address to unlock/enable your JCP Portal account. Further JCP account instruction may be found at https://www.dla.mil/Logistics-Operations/Services/JCP/.
INERTIAL NAVIGATION
CONTACT INFORMATION|4|N721.29|GC1|215-697-3473|LARA.L.SZOTT.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS AFTER DELIVERY OF UNIT|45 DAYS AFTER THE DEFECT WAS FOUND||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|334511|1350||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| The purpose of this amendment is to increase the QTY from 13/ea to 36/ea and to extend the quotes due date to 23 NOVEMBER 2026. This amendment hereby extends the quotes due by date to 29 DEC 2025. Please submit quote via email to LARA.L.SZOTT.CIV@US.NAVY.MIL by the due date specified on page 1, block 10. Required RTAT: 25 days after receipt of asset. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. This RFQ is for repair. This RFQ is in accordance with FAR part 15. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: INERTIAL NAVIGATION ;34200550-004; P/N, ;7R 6605-01-619-3381; NSN, ;N/A; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. INERTIAL NAVIGATION ;Honeywell Military; Company Name , ;13350 US Hwy N. Clearwater FL. 33764; Address , ;0BFA5; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
INERTIAL NAVIGATION
CONTACT INFORMATION|4|N721.29|GC1|215-697-3473|LARA.L.SZOTT.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS AFTER DELIVERY OF UNIT|45 DAYS AFTER THE DEFECT WAS FOUND||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|334511|1350||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| This amendment hereby extends the quotes due by date to 29 DEC 2025. Please submit quote via email to LARA.L.SZOTT.CIV@US.NAVY.MIL by the due date specified on page 1, block 10. Required RTAT: 25 days after receipt of asset. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system.In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. This RFQ is for repair. This RFQ is in accordance with FAR part 15. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: INERTIAL NAVIGATION ;34200550-004; P/N, ;7R 6605-01-619-3381; NSN, ;N/A; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. INERTIAL NAVIGATION ;Honeywell Military; Company Name , ;13350 US Hwy N. Clearwater FL. 33764; Address , ;0BFA5; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
FY26 MCN P309, School Age Care Centers Replacement, Camp Foster and McTureous, Okinawa, Japan
This is an invitation for bid (IFB) to award a firm fixed price (FFP) construction contract to replace the current School Age Care Centers located on Camp Foster and Camp McTureous, Okinawa, Japan.
FY26 MCN P309, School Age Care Centers Replacement, Camp Foster and McTureous, Okinawa, Japan
This is an invitation for bid (IFB) to award a firm fixed price (FFP) construction contract to replace the current School Age Care Centers located on Camp Foster and Camp McTureous, Okinawa, Japan. ***Amendment 0001 - Correct the following attachments included the PIEE Solicitation Module: 1. Add P309_SACC_RTA Specifications_Division 1, and 2. Remove Duplicate attachment P309_SACC_MCT_RTA_Specifications.
$495M Small Business Multiple Award Task Order Contract for Design-Build and Design Bid-Build Construction Services for the State of Hawaii, U.S. Army Corps of Engineers, Honolulu District
This announcement constitutes a Solicitation notice in accordance with RFO Subpart 5.2. The U.S. Army Corps of Engineers (USACE), Honolulu District (POH) hereby announces a 100% Small Business Set-Aside competitive solicitation entitled, $495M Small Business Multiple Award Task Order Contract (MATOC) for Design-Build and Design-Bid-Build Construction Services in the State of Hawaii. Refer to the attached documents for more information on this particular requirement.
Garage Demolition and Replacement
82726B0005-Bronx Community Districts 9, 10 & 11 Garage Demolition and Replacement, 800 Zerega Avenue, Bronx, NY 10473 and South Lot Swing Space, 530 Zerega Avenue, Bronx, NY 10473 Last day of questions is 10/23/2026 Pre-bid Conference Information: Attendance at the pre-bid conference is optional. Date: September 1, 2026 Place: Virtual Meeting Time: 10:00 a.m. Microsoft Teams meeting: Join: https://teams.microsoft.com/meet/213706820777687?p=HcbTZj0zB33T05DVeA Meeting ID: 213 706 820 777 687 Passcode: HG2Ks9gS Need help? System reference Dial in by phone +1 646-893-7101, 232159143#, United States, New York City Find a local number Phone conference ID: 232 159 143# Join on a video conferencing device Tenant key: cityofnewyork@m.webex.com Video ID: 115 248 335 9. A site inspection will not be available at the same time as the pre-bid conference. Date and Time to Submit Bids: March 4, 2027, at 1:00 p.m Bid Opening Date and Time: March 4, 2027, at 2:00 p.m. Bid Opening Place: Virtual Meeting Microsoft Teams meeting: Join: https://teams.microsoft.com/meet/247501752938934?p=k0iBnUCExkLFRzgetF Meeting ID: 247 501 752 938 934 Passcode: gR3Vo6Ay Need help? System reference Dial in by phone +1 646-893-7101, 531522769#, United States, New York City Find a local number Phone conference ID: 531 522 769# Join on a video conferencing device Tenant key: cityofnewyork@m.webex.com Video ID: 112 956 490 8 Everything should be requested and submitted in Passport. Questions should be submitted in Passport Forum.