Skip to content

Bid Board

1,071 live construction bids & tenders

Open opportunities from government portals across the US, UK, and Canada — plus projects posted by contractors on Constructeams. Filter by trade and location, then connect bid activity back to your workspace. Free to browse; create a free account to save searches, respond, and get alerts.

CanadaBuysCloses in 5 days

Phase 1 – EP922-270156 – AAFC LeRDC B102 Electrical Upgrade

Please note that late submissions will not be considered or accepted. This is the first phase (Phase One) of a two-phase process: the first phase will evaluate the interest of suppliers; the second phase (Phase Two) will invite the suppliers to provide a financial bid on the project based on the specifications and drawings. The qualification list will expire within 60 days or upon award of a contract in Phase Two, whichever is earlier, and the prequalification list will not be used in any other solicitation. The intent of the project is to update/replace the 1977 electrical system infrastructure providing power to Building 102 at the Lethbridge Research and Development Center and rectify all electrical codes issues and electrical power deficiencies found in the building. Ensure existing (or subsequent new) protective devices and electrical equipment are rated for sufficient fault current, coordination study requirements, trip settings, and suitable Arc Flash Energy Levels.

Alberta
Due Aug 10, 2026View bid
SAM.govCloses in 5 days

Roof Repairs - National Center for Cool and the Cold-Water Aquaculture (NCCCWA)

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1232SA26Q0971 is issued as a Request for Quotation (RFQ) for the Roof Repairs at the National Center for Cool and the Cold-Water Aquaculture, located in Kearneysville, West Virginia. The Period of Performance is 240 days from issuance of the Notice to Proceed. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238160 – Roofing Contractors. The small business size standard is $19 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. A mandatory Site Visit is scheduled for this requirement. Please refer to the Terms and Conditions Document for details..

KearneysvilleRoofing
Due Aug 10, 2026View bid
SAM.govCloses in 5 days

Y--GOGA 319407 - Bridge Preservation

GOGA 319407 - Bridge Preservation

United StatesPaving Asphalt
Due Aug 10, 2026View bid
SAM.govCloses in 5 days

Z1DZ--Building 5 & 60 Door Replacements at VAMC Central Western MA

This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in FAR 12.603, as supplemented by the current Federal Acquisition Circular (FAC 2026 01) and the Department of Veterans Affairs Acquisition Regulation (VAAR). This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. This acquisition is 100% set aside for verified SDVOSBs in accordance with VAAR 852.219 73. Offerors must be listed as Verified in the SBA Veteran Small Business Certification (VetCert) database both at the time of quote submission and at the time of award. The associated North American Industrial Classification System (NAICS) code for this procurement is 238290, with a small business size standard of $22.0 million. The PSC is Z1DZ. The Department of Veteran Affairs (VA) Central Western Massachusetts Medical Center located at 421 North Main St. in Leeds, MA 01053 is seeking to purchase services for the replacement of Building 5 Automatic Doors and Building 60 Entry Doors as outlined in the Performance Work Statement: Performance Work Statement 1 Overview General The Contractor provide professional services to include all labor, transportation, materials, apparatus, tools, equipment and permits necessary to in accordance with this design scope of work. All work must meet VHA, OSHA, EPA, and Mass DEP standards. Project Specific Scope of Work - Building 5 Automatic Doors and Building 60 Entry Doors Work consists of procuring and replacing all components, Doors, lockset, door closers, door sensors, etc. (6) doors , (5) Door Closers (2) Door Sensors for entry. The Period of Performance for this project is 90 calendar days. General Scope Items The following is a list of general scope considerations: Meet with VA Facilities staff, review existing drawings and estimates, and perform fieldwork necessary to determine required materials and equipment. All field work shall be scheduled at least 72 hours in advance with VA Facilities Management. The site shall be left clean of all construction debris and hazardous materials. Coordinate with VA CWM HCS GEMS coordinator Rob Michalik at 413-584-4040 22330 Design and installation to meet the most stringent of latest edition of the NEC and NFPA. Submit product data and shop drawings for all materials prior to installation. Submittals and shop drawings shall be approved by COR. Contractors shall supply all tools, parts, labor, travel and equipment to perform the removal, disposal of all old equipment and installation of all the new equipment. All proper LOTO devices and procedures are to be implemented. Contractors will keep and maintain a clean and neat work area. Any damage to ceiling tiles, walls or flooring will be fixed by the contractor. All work shall be performed in accordance with Massachusetts DEP and DLS regulations and OSHA codes. Specific Scope Items: Building 5. 1-8; Building 60. 9-19 Disconnect Power to Door Closers and Door Sensors and LOTO Remove Door Closers and Dispose of Correctly Remove Door Sensors and Dispose of Correctly Remove Existing Lock Sets and turn into the COR Remove and Dispose Door Hinges and Double Doors Install New Roll Up Door to fit within space Install New (2) Buttons Open/Close and connected to door to ensure when activated doors will open and close. To be installed on the Interior/Exterior of where door is located. Install Key Switch to the interior button to turn the system on and off. Key Switch Must be IC Core capability Remove 4 Doors and Dispose of correctly Remove Door Closers and Return to COR Remove Frame and Arch of Existing Front Door Install New Arch with Glass and New Frame Install New Front Door (Aluminum Frame and Glass) With a fixed sidelight Install Door Closers for Front Door Install Handicap Button for Front door Install New Glass Panel Door on West Side Install New Door Closer on West Side and a New handicap button Install New Glass Panel Door on East Side Install New Door Closer on East side and a new handicap Button . Test and Provide Report of Proper Functionality to COR. Test should be coordinated a minimum of 72 hours in advance with COR so that person can be present along with any other necessary VA Stakeholders Site Access and Management Requirements The contractor shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the project. The contractor must have the following additional requirements before working on site: Contractor badge must be obtained and visibly worn by contractor or representative at all times while on campus Parking is restricted to the lower lots (N and P). One vehicle will be allowed to park behind Building 12 L lot in an employee authorized spot. These requirements are applicable to all contractor employees and subcontractors working in and around campus building unless stated otherwise by COR. The contractor is ultimately responsible for the behavior of employees and subcontractors. Questions or concerns may be addressed by the COR. List of Documents The following list of documents can be provided for Contractor use and incorporation into the project documents: Sample Forms Material Submittal Form RFI Form Infection Control Risk Assessment (ICRA) and Permit VA CWM Utility Shutdown Form Construction Safety Guidebook | Healthcare Environment and Facilities Programs (va.gov) All on-site work (including cleanup) shall take place during the following times, unless otherwise approved by the COR: 07:30-15:15h Monday through Friday Except the following: Noisy work 70Db and above inside the building Off Hours M-F 1700-0600 or Weekends. Excessively Noisy exterior work Off Hours M-F 1700-0600 or Weekends. Work on Federal Holidays requires permission from the COR except Memorial Day and Veterans Day. Work Location and Restrictions The work site location is at the Edward P. Boland Campus- VA Central Western Massachusetts Healthcare System. The contract work is intended to be limited to Building 5 Pine Building and Building 60 Chapel. When the contractor s work interferes with hospital functions, such as when work produces excessive noise, odors, dust, utility service interruptions, or other interferences with normal hospital operations that cannot be contained within the area of work, the contractor shall schedule said work at other than normal hours and as directed by the COR. Project Safety Contractor shall comply with the VA Construction Safety Guidebook as well as all OSHA requirements. Exterior work areas shall be fenced with temporary fence. Interior work areas must maintain ICRA barriers which shall not impede patient through traffic. Priority Door Replacement for Building 60 is as follows ; 1.) East Door , 2.)West Door, 3.) Front Door so there is safe egress for patients Entering and Exiting the building. FAR Clause 52.236-13 subparagraph (f) is invoked: (f) Before Commencing the work, the Contractor shall- (1) Submit a proposed written plan for implementing this clause. The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance and a plan for controlling these hazards: and (2) Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program. [56 FR 55376, Oct. 25, 1991] Penetrations of Fire and Smoke Barriers Prior to any installation of equipment, cables, power connections, conduit, piping or other work that penetrates a smoke or fire barrier, all such work must be approved by the site-specific Facilities Management Service (FMS) via the COR. An above ceiling/penetration permit must be secured from FMS prior to disturbing the integrity of the barrier. The permit must be available for inspection at the project location. After the work is completed, the penetration must be repaired (sealed) according to accepted practice and utilizing materials (including UL/FM-listed through penetration fire stopping materials) that meet the original barrier construction requirements in order to restore the designed specifications for smoke and fire compartmentalization. Upon completion of any penetration repair, a visual inspection for approval must be requested from, and completed by FMS. Interim Life Safety Protection Measures Contractors shall participate with the VA in the preparation of an interim life safety measures and fire protection Plan that will be implemented during construction of this project. At a minimum, contractor shall comply with the following requirements of an interim life safety measures and fire protection plan: Ensure exits provide free and unobstructed egress for all building occupants. If required by contractor s operations, establish and mark alternate means of egress for all building occupants. Contractors shall always maintain escape facilities from the work area for construction workers. Means of egress in construction areas will be inspected daily. Ensure free and unobstructed access to all areas of the project site for emergency services and for emergency forces. Do not impair means of egress, automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch in accordance with NFPA standards for impairment. Request approval of impairments from the COR in writing a minimum of 72 hours in advance. When required, a fire watch shall be provided by a qualified person by the contractor who shall maintain constant observation of the affected area and have no other duties. The person providing the fire watch shall be trained in fire prevention and in the use of fire extinguishers, occupant hose lines, occupant fire protection system, in sounding the building fire alarm and in notifying the local fire department, and in understanding the particular fire safety situation for the project. Provide written procedures and guidelines for construction personnel and post in the immediate areas of construction detailing what to do and who to call in the event of fire or emergency. Maintain the construction area to minimize the potential for fire or safety hazards resulting from storage of construction material, construction waste and debris during construction operations. All temporary construction shall be built of noncombustible/fire retardant materials and shall be smoke tight. Contractors shall comply with the requirements and ensure efforts to prevent false fire alarms. Parking Parking is rigidly controlled throughout the Medical Center. Contractor parking is only allowed in designated areas (subject to change). Parking in designated patient parking areas is strictly prohibited. Parking on grass is also prohibited. Parking for equipment necessary to perform the work will be authorized in advance of starting the project. Parking is restricted to the lower lots (N and P). One vehicle will be allowed to park behind Building 12 L Lot in an employee authorized spot. Storage of Equipment and Materials The contractor shall arrange with the COR for allocation of required workspace and for the storage of equipment and material to be used for this project. Storage space is very limited. There are no exclusive areas within the campus that can be given to the contractor for their storage needs. Additionally, a contractor trailer is NOT permitted for this project.  The Contractor should schedule delivery of materials to limit the amount of storage space and time. The warehouse CANNOT accept/store deliveries. Debris Removal The Contractor/Installer shall be required to remove waste materials and debris daily (unless otherwise authorized by COR) from the campus. All waste material and debris shall be removed off the site by the contractor and shall be disposed of in accordance with applicable State and Federal regulations. Site Utilities The Contractor/Installer should note this scope of work does not detail all existing structures, utilities, or components that may potentially interfere with the contract work required. The contractor shall note any obstruction, utility, or condition that may hinder or interfere with the execution of this contract, and the contractor shall make provisions in their contract price to resolve such interferences and other conditions that may hinder the proper completion of the work. All proposed utility relocations, reallocations, and shutdowns shall be approved by the COR prior to commencing such work. The contractor shall verify all existing utility installations and take appropriate action prior to working around any potential utility installation. In the event a shutdown, restriction, or interruption of any utility services is required, a written request must be submitted (at least 14 calendar days in advance) and approved by the VA COR. All utility shutdowns must be reviewed and approved by the VA. Infection Control All work shall be performed in accordance with the Construction Specifications for Infection Control of the Edward P Boland VA Medical Center. For purposes of this project, the work shall be accomplished using the controls indicated in the specifications and on the Infection Control Construction Permit attached. No work will be allowed to proceed until an Infection Control Construction Permit has been completed and signed and all protective measures required by the permit are in place. Material and Workmanship Quality All materials and workmanship shall comply with all codes, standards, and requirements of all Authorities Having Jurisdiction (AHJ). All work shall be done in accordance with contract terms and conditions and in a professional manner according to the best trade practices and to the satisfaction of the COR. This includes work performed by subcontractors. **************** End PWS **************** The following solicitation provisions apply to this acquisition: FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services (DEVIATION AUG 2025) FAR 52.212-2 Evaluation-Commercial Products and Commercial Services [In accordance with FAR 12.301(c) when the use of evaluation factors is appropriate, the contracting officer may (1) Insert the provision at 52.212-2, Evaluation-Commercial Products and Commercial Services, in solicitations for commercial products or commercial services (see 12.602); or (2) Include a similar provision containing all evaluation factors required by 13.106, subpart 14.2 or subpart 15.3, as an addendum (see 12.302(d)).] FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://sam.gov/ in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services. If paragraph (j) of the provision is applicable, a written submission is required. As prescribed in 852.102(a), insert the following provision: Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008) The following provisions or clauses incorporated by reference in this solicitation must be completed by the offeror or prospective contractor and submitted with the quotation or offer. Copies of these provisions or clauses are available on the Internet at the Web sites provided in the provision at FAR 52.252-1, Solicitation Provisions Incorporated by Reference, or the clause at FAR 52.252-2, Clauses Incorporated by Reference. Copies may also be obtained from the contracting officer. [Contracting officer shall list all FAR and 48 CFR Chapter 8 (VAAR) provisions and clauses incorporated by reference that must be completed by the offeror or prospective contractor and submitted with the quotation or offer.] (End of provision) 852.219-76 VA Notice of Limitations on Subcontracting Certificate of Compliance for Supplies and Products (JAN 2023) (DEVIATION) As prescribed in 819.7011(c), insert the following clause. The contracting officer shall tailor the clause in paragraph (a)(2)(iii) as appropriate: (iii) The offeror certifies that it will supply the end item of a small business manufacturer, processor, or producer made in the United States, unless a waiver as provided in 13 CFR 121.406(b)(5) has been issued by SBA. Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror]. Printed Name of Signee: Printed Title of Signee: Signature: Date: Company Name and Address: (End of clause) Parent topic: Subpart 852.2 - Text of Provisions and Clauses 6. FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (APR 2026) (a) Definitions. As used in this clause Program participation means membership or participation in, or access or admission to training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor. Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources. (b) In connection with the performance of work under this contract, the Contractor agrees as follows: (1) The Contractor will not engage in any racially discriminatory DEI activities; (2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause; (3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts; (4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and (5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause. (6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4). (c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States. (End of clause) 52.252-2 Clauses Incorporated by Reference (FEB 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far. The following contract clauses apply to this acquisition: 52.203-11 C and D Regarding Payments to Influence Certain Federal Transactions. (SEP 2024) 52.203-18 Prohibition on Contracting with Entities (JAN 2018) 52.204-7 System for Award Management Registration (DEVIATION NOV 2025). 852.203 70 Commercial Advertising (MAY 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. (DEVIATION NOV 2025). 52.219-14 Limitations on Subcontracting (OCT 2022). 52.233-3 Protest after Award (DEVIATION NOV 2025). 52.233-4 Applicable Law for Breach of Contract Claim (DEVIATION NOV 2025). 52.244-6 Subcontracts for Commercial Products and Commercial Services. (DEVIATION NOV 2025). 852.219-73 VA Notice to Total Set-Aside for Certified Service-Disabled Veteran-Owned Small Businesses (JAN 2023) (DEVIATION) 852.232-72 Electronic Submission of Payment Requests (NOV 2018) 852.246-71 Rejected Goods (OCT 2018) 52.212-4 Contract Terms and Conditions Commercial Products and Commercial Services (DEVIATION AUG 2025). 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders Commercial Products and Commercial Services (OCT 2025). The following subparagraphs of FAR 52.212-5 are applicable: 52.203-17 Contractor Employee Whistleblower Rights.(NOV 2023) 52.204-13 System for Award Management-Maintenance (DEVIATION NOV 2025) 52.204-14 Service Contract Reporting Requirements (Oct 2016). 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024). 52.222-3 Convict Labor (JUNE 2003). 52.222-21 Prohibition of Segregated Facilities (APR 2015). 52.222-26 Equal Opportunity (SEPT 2016). 52.222-35 Equal Opportunity for Veterans (JUN 2020). 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020). 52.222-37 Employment Reports on Veterans (JUN 2020). 52.222-50 Combating Trafficking in Persons (OCT 2025). 52.222-54 Employment Eligibility Verification (JAN 2025). 52.225-1 Buy American-Supplies (OCT 2022). 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021). 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024). 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (OCT 2018). 52.242-5 Payments to Small Business Subcontractors (JAN 2017). 52.222-41 Service Contract Labor Standards (AUG 2018). 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014). 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (MAY 2014). 52.222-50 Combating Trafficking in Persons.(DEVIATION OCT 2025) 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022). 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022). 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.(MAY 2024) 52.233-3 Protest after Award.(DEVIATION NOV 2025) 52.233-4 Applicable Law for Breach of Contract Claim.(DEVIATION NOV 2025) 52.203-13 Contractor Code of Business Ethics and Conduct (NOV 2021). 52.203-17 Contractor Employee Whistleblower Rights (NOV 2023). 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017). 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021). 52.219-8 Utilization of Small Business Concerns (JAN 2025). 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) 52.212-2 Evaluation-Commercial Prods and Commercial Svcs (DEVIATION AUG 2025) SAM: Interested parties shall be registered in System for Award Management (SAM) as prescribed in FAR Clause 52.232-33. SAM information can be obtained by accessing the internet at www.sam.gov or by calling 1-866-606-8220. Interested parties not registered in SAM in sufficient time to meet the VA s requirement will be ineligible to receive a government contract. This determination will be at the discretion of the Contracting Officer. System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications Commercial Products and Commercial Services. The VA utilizes VISTA to issue a purchase order and liquidate invoices. Failure to register in VISTA may result in exclusion from the issuance of a VA contract. This determination will be at the discretion of the Contracting Officer. Interested parties with no prior VA contracts can apply here: https://www.cep.fsc.va.gov/ Instructions to Offerors: All quoters shall submit the following: 1. Technical Proposal Evidence of OEM training/certifications Detailed Technical Approach & PWS Compliance Safety/LOTO/PPE/infection control plans Parts sourcing plan 2. Past Performance At least three recent/relevant contracts of similar scope 3. Price Proposal Completed pricing for all base and option CLINs Confirmation of SDVOSB status via VetCert 4. SAM Registration & Reps/Certs Active SAM registration required Complete 52.212 3 or confirm online SAM status The following are the decision factors: Evaluation will be conducted under FAR 12.602: Technical (most important) Past Performance Price Technical and past performance, combined, are more important than price. Award may be made without discussions. The award will be made to the response most advantageous to the Government. Responses should contain your best terms and conditions. To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition." OR "The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:" Quoters shall list exception(s) and rationale for the exception(s), if any. Questions shall be submitted to the Contracting Officer in writing via e-mail. Oral questions are not acceptable due to the possibility of misunderstanding or misinterpretation. The cut-off date and time for receipt of questions is 27-JUL-2026 by 4pm EST. Questions received after this date and time may not be answered. Questions shall be answered in a formal amendment to the solicitation so all interested parties can see the answers. Submission of your response shall be received not later than 10-AUG-2026 by 4pm EST. RFQ responses must be submitted via email to: juliette.buchanan@va.gov. Hand deliveries shall not be accepted. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Point of Contact Juliette Buchanan Juliette.Buchanan@va.gov ATTACHMENT 1 PRICE SCHEDULE ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001 Parts Provides all materials, components, doors, frames, sensors, hardware, electrical accessories, and installation related supplies required to complete the Building 5 and Building 60 door replacement project in accordance with the PWS. 1 EA $___________ $____________ 0002 Labor Covers all labor required for removal, disposal, installation, testing, coordination, field work, compliance with safety and infection control measures, and documentation as detailed in the PWS. 1 JB $___________ $____________ GRAND TOTAL $_________________ ATTACHMENT 2 PAST PERFORMANCE WORKSHEET 1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization: 2. Contracting Activity Address: 3. Contract Number: 4. Date of Contract Award: 5. Beginning Date of Contract: 6. Completion Date of Contract: 7. Contract Value: 8. Type of Contract: 9a. Technical Point of Contact: 9b. Contracting Point of Contact: Name: Name: Title: Title: Address: Address: Telephone: Telephone: Email: Email: 10. Place of Performance: 11. Description of Work (Use a continuation sheet if necessary): 12. List any commendations or awards received: 13. List of Major Subcontractors: PAST PERFORMANCE WORKSHEET 1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization: 2. Contracting Activity Address: 3. Contract Number: 4. Date of Contract Award: 5. Beginning Date of Contract: 6. Completion Date of Contract: 7. Contract Value: 8. Type of Contract: 9a. Technical Point of Contact: 9b. Contracting Point of Contact: Name: Name: Title: Title: Address: Address: Telephone: Telephone: Email: Email: 10. Place of Performance: 11. Description of Work (Use a continuation sheet if necessary): 12. List any commendations or awards received: 13. List of Major Subcontractors: PAST PERFORMANCE WORKSHEET 1. Name of Contracting Activity, Government Agency, Commercial Firm or other Organization: 2. Contracting Activity Address: 3. Contract Number: 4. Date of Contract Award: 5. Beginning Date of Contract: 6. Completion Date of Contract: 7. Contract Value: 8. Type of Contract: 9a. Technical Point of Contact: 9b. Contracting Point of Contact: Name: Name: Title: Title: Address: Address: Telephone: Telephone: Email: Email: 10. Place of Performance: 11. Description of Work (Use a continuation sheet if necessary): 12. List any commendations or awards received: 13. List of Major Subcontractors:

LeedsElevators Lifts
Due Aug 10, 2026View bid
SAM.govCloses in 5 days

Switchgear Replacement and Upgrades Project for BLDG 49

The purpose of this solicitation is to replace the existing emergency equipment in electrical vault, which currently contains 1500kW diesel generator, day tanks and switchgear, switchboard, distribution panels, transfer switch, etc. that are outdated and no longer meet present-day standards for capacity, efficiency, and reliability. (see the attached statement of work for additional details) A site visit will be scheduled for 20 JUL @1:00 pm. To be put on the list please email brian.baek@nih.gov with the vendor name and individuals that will be attending (due date is 17 JUL COB). Request for Information (RFI) is due by COB 22 JUL, the answers will be posted the following week through an amendment. When submitting the proposal, send to the Contracting Officer @brian.baek@nih.gov. Please see the solicitation document attached to the posting regarding instructions on the proposal submission.

Bethesda
Due Aug 10, 2026View bid
SAM.govCloses in 5 days

CHASSIS,ELECTRICAL-

CONTACT INFORMATION|4|N744.4|ENH|EMAIL ONLY|JAMES.E.LEWIS5@NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|RECEIVING REPORT AND INVOICE COMBO|NA|TBD|N00104|TBD|TBD|TBD|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2.The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3.All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be 'issued' by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to 'issue' contractual documents as detailed herein. 4.If the offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the offeror must provide a signed letter of authorization as a distributor on the OEM?s letterhead. 5.If requirement will be packaged at a location different from the offeror?s address, the offeror shall provide the name, street address, and CAGE of the facility. 6.Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CHASSIS,ELECTRICAL- . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CHASSIS,ELECTRICAL- furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;0KPC5 CCHA40450; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer. 6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161.

United States
Due Aug 10, 2026View bid
Delaware Open BidsCloses in 5 days

PAVEMENT & REHABILITATION, SUSSEX I, (US 13 NB & SB, DELMAR TO LAUREL), 2026

Delaware
Due Aug 11, 2026View bid
NYC City RecordCloses in 5 days

Bid Extension: 82626B0018-BEDC-CAT-213FAC-M Reconstruction of Ashokan Headworks

This Competitive Sealed Bid (RFx') is being released through PASSPort, New York Citys online procurement portal. Responses to this RFx should be submitted via PASSPort. To access the solicitation, vendors should visit the PASSPort Public Portal Navigator at https://passport.cityofnewyork.us/page.aspx/en/rfp/request_browse_public. This will take you to the Public Portal of all procurements in the PASSPort system. To quickly locate the RFx, insert the EPIN 82626B0018 into the Keywords search field. If you need assistance submitting a response, please contact MOCS Service Desk: mocssupport.atlassian.net/servicedesk/customer/portal/8

New York
Due Aug 11, 2026View bid
NYC City RecordCloses in 5 days

Bid Extension: 13202301: Harlem Community Retail Pharmacy

LOCATION NYC Health + Hospitals / Harlem, 506 Lenox Avenue, New York, NY 10037. MANDATORY PRE-BID MEETING INFORMATION * Only bidders who attend the mandatory pre-bid meeting will be allowed to bid. The mandatory pre-bid meetings are scheduled for: * * Tuesday, June 23, 2026 at 10:00 A.M. * Wednesday, June 24, 2026 at 10:00 A.M.  * Location: NYC H+H / Harlem, MLK Building, Lobby REQUESTS FOR INFORMATION (RFI) * Technical questions must be submitted in writing by email no later than Friday, June 19, 2026 by COB to shapirog1@nychhc.org. ADDITIONAL INFORMATION * NYC H+H PLA: All Bids shall be in accordance with the terms of the NYC Health and Hospitals (HHC) Project Labor Agreement. The awarded contractor will be required to execute and submit a Letter of Assent to NYC H+H. * Certified Payroll: Beginning January 1, 2026, all certified payrolls for contracts bid on or after December 31, 2025 must be submitted electronically through NYC eComply. * Bidders List: We encourage sub-contractors to attend the pre-bid meetings in order to obtain access to the potential bidder's list. You are encouraged to arrive at least thirty (30) minutes before mandatory meeting start time, and a grace period of no more than fifteen (15) minutes will be granted to late arrivals. Social distancing protocols must be observed, and kindly limit your staff to one person at the meetings.  MWBE: Under Article 15A of The State of New York, the following M/WBE goals apply to this contract: M/WBE 31%. These goals apply to any bid submitted of $500,000 or more. Bidders not complying with these terms will have their bids declared non-responsive. Required Trade Licenses where applicable.

New York
Due Aug 11, 2026View bid
Find a Tender (UK)Closes in 5 days

Operation and Maintenance Services for the Ness Energy from Waste Facility

Aberdeen City Council, Aberdeenshire Council and Moray Council (together hereinafter referred to as the "Partner Councils") are seeking to procure Operation and Maintenance Services for the Ness EfW Facility for up to 25 years.

Aberdeen, Scotland£477,616,363 (est.)
Due Aug 11, 2026View bid
SAM.govCloses in 6 days

Frequency Converter Relocation

The 164th Airlift Wing located at 4593 Swinnea Memphis, TN 38118, is issuing a combined synopsis/solicitation for a single award contract to be prepared in accordance with the format in FAR 12.6, as supplemented with additional information included in this notice. The North American Industry Classification System (NAICS) Code for this requirement is 238210 Electrical Contractors and Other Wiring Installation Contractors, with a Small Business size standard of $19 million. This Request for Quote (RFQ) for Provide and Install 175A Circuit Breakers is being set aside for Total Small Businesses. The Government intends to award a Firm-Fixed Price contract. Provide and install two new 175A breaker and conduit. The contractor shall: In building 4455 & 4513, provide and install two new 175A breaker in existing switchgear in Electrical Room #CC123 and M1072. Provide and install new 2” EMT conduit with #2/0 THHN CU feed from new breaker to the location in the Hangars where the 400Hz Unit will be relocated. Terminate and test new feed per the attached Performance Work Statement (PWS). A Site Visit will be conducted on 30 July 2026 at 9:00 am CDT. Interested contractors are highly encouraged to attend the site visit. “Award will be made to the offeror who represents the best value to the Government as outlined in accordance with the criteria set forth within the solicitation. No contract award will be made until appropriated funds are made available.”

MemphisElectrical
Due Aug 11, 2026View bid
SAM.govCloses in 6 days

Uninterruptable Power Supply (UPS) Systems and Battery Replacement

Pre-Solicitation Only. No solicitation is currently provided. This synopsis constitutes neither a Request for Quotation (RFQ), nor an Invitation for Bids (IFB), nor does it restrict the Government in any way to an ultimate acquisition approach. Readers shall not construe this pre-solicitation notice as a commitment by the Government for any purpose. The Government intends to award a single firm-fixed-price purchase order to a small business concern. The applicable NAICS code for this procurement is 238210, Electrical Contractors and Other Wiring Installation Contractors, with a size standard of $19,000,000. Prospective contractors must be actively registered in the System for Award Management (SAM) under NAICS 238210 to be eligible to receive an award. For more information, visit the website at https://www.sam.gov. In accordance with (IAW) Revolutionary Far Overhaul (RFO) FAR12.201-1, Simplified Procedures, the Mission and Installation Contracting Command at Joint Base LewisMcChord (MICC-JBLM) intends to solicit quotations directly from suppliers for Uninterruptable Power Supply (UPS) Systems and Battery Replacement. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform turnkey Uninterruptible Power Supply (UPS) installation, testing, battery replacement, and the safe removal and disposal of decommissioned equipment at JBLM as defined in the PWS. Period of performance for this purchase order will be no more than 12 months with an estimated completion date of September 30, 2027. The Government will not entertain questions at this time; however, potential offerors may submit comments in response to this pre-solicitation notice. Respondents must submit any comments/recommendations no later than (NLT) 10:00AM (PDT) August 11, 2026, via email to Mr. Eric Harris at eric.g.harris.civ@army.mil. The Government will not post responses or answers to submitted comments or recommendations.

Joint Base Lewis McChordElectrical
Due Aug 11, 2026View bid
CanadaBuysCloses in 6 days

Roof Repair and upgrade, Kouchibouguac National Park

5P468-26-0078/A Roof Repair and upgrade, Kouchibouguac National Park BIDS RECEIVED BY FAX AND EMAIL WILL BE ACCEPTED AS OFFICIAL. PARKS CANADA IS NOT CURRENTLY ACCEPTING BIDS VIA SAP ARIBA, YOU MUST SUBMIT YOUR BID VIA FAX OR EMAIL AS INDICATED IN THE SOLICITATION DOCUMENT. BIDS RECEIVED IN-PERSON OR BY COURIER WILL NOT BE ACCEPTED. The only acceptable email address for responses to the bid solicitation is soumissionsami-bidsrpc@pc.gc.ca . Bids submitted by email directly to the Contracting Authority or to any email address other than soumissionsami-bidsrpc@pc.gc.ca will not be accepted. The only acceptable facsimile for responses to bid solicitations is 1-855-983-1808. The maximum email file size that Parks Canada is capable of receiving is 15 megabytes. The Bidder is responsible for any failure attributable to the transmission or receipt of the emailed bid due to file size. The Bidder should be cognisant of the size of the email as a whole, and not only the attachments. Please take into consideration that some attachments, when sent, may be resized during the email transfer. If the email size is too large, the Bidder should send the bid in multiple emails properly labeled with the solicitation number, project name, and indicate how many emails are included (ex. 1 of 2). Emails with links to bid documents will not be accepted. Bid documents must be sent as email attachments. REQUIREMENT The objective of this contract is to repair/upgrade the roof on the VRC/Administration building as per Drawings and specifications To assist with bonding and insurance requirements, this project is estimated at a value between $ 100,001 > $ 250,000, Taxes extra. TWO-SUBMISSION BID This Bid shall be submitted following a “two-submission” procedure. Refer to SI04 of the Special Instructions to Bidders. CONTRACTOR SELECTION AND INDIGENOUS PARTICIPATION PLAN The Contractor should ensure provision of specific and agreed upon benefits for Indigenous People and Indigenous Businesses in the Area of the Contract. This Invitation to Tender contains bid criteria in order to provide socioeconomic benefits to Indigenous communities within the area covered by the contract. PERIOD OF CONTRACT / DELIVERY DATE Contractor must perform and complete the Work no later than October 30, 2026. OPTIONAL SITE VISIT It is recommended that the Bidder or a representative of the Bidder visit the work site. Arrangements have been made for the site visit to be held at 186 Route 117, Kouchibouguac, NB E4X 2P1 on July 31, 2026. The site visit will begin at 09:00 AM Local Time. Bidders must communicate with the Contracting Authority no later than July 30, 2026 to confirm attendance and provide the name(s) of the person(s) who will attend. Bidders must also complete and submit a certification. Bidders who do not confirm attendance, provide the name(s) of the person(s) who will attend, or who do not complete and submit the above certification as required will not be allowed access to the site. Bidders will be requested to sign an attendance sheet. No alternative appointment will be given to bidders who do not attend or do not send a representative. Bidders who do not participate in the visit will not be precluded from submitting a bid. Any clarifications or changes to the bid solicitation resulting from the site visit will be included as an amendment to the bid solicitation. ENQUIRIES All enquiries of a technical and contractual nature are to be submitted to the Contracting Authority. Enquiries regarding this solicitation must be submitted in writing and should be received no later than five (05) business days prior to the date set for solicitation closing to allow sufficient time to provide a response. Enquiries received after that time may result in an answer NOT being provided. INFORMATION National Parks Regulations require that all work is to be performed in accordance with the ordinances, laws, rules and regulations set out in the National Park Act. Bidders that consider themselves qualified to provide this Work and intend to submit bids on this project should obtain documents from the Government Electronic Tendering Service through the Government of Canada tendering service at http://canadabuys.canada.ca/en/tender-opportunities. Addenda, when issued, will be available from the Government of Canada tendering service. Bidders that elect to base their bids on documents obtained from other sources do so at their own risk. Late submissions will not be considered. The Crown retains the right to negotiate with suppliers on any procurement. Documents may be submitted in either official language of Canada. Parks Canada has made every effort to provide equivalent documents in both official languages, however, if you find any discrepancies between the English and French documents, please notify the contract officer listed in this opportunity as soon as possible so that we can rectify the situation.

New Brunswick
Due Aug 11, 2026View bid
CanadaBuysCloses in 6 days

EC373-270267 New Construction - FRDC B180 Replacement

This is the first phase (Phase One) of a two-phase process: the first phase will evaluate the qualifications of all interested suppliers; the second phase (Phase Two) will invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. The qualification list will expire within 60 days or upon award of a contract in Phase Two, whichever is earlier, and the prequalification list will not be used in any other solicitation. Work of this Contract comprises general construction, and site development, for a new single-storey building of approximately 1,326 m2 on Innovation Rd. at the AAFC Fredericton Research and Development Centre, in Fredericton, NB. Work also includes abatement and demolition of the existing building B180, adjacent to the new building site. Building 180, also known as the Farm Services building, is a multi-use building consisting of a mechanics and machining shop, cold room storage for bulk potato storage, and support spaces such as offices and washrooms The existing building B180 must remain fully operational while the new building is being constructed. Abatement and demolition of B180 to begin only when the new building is completed and the existing B180 is vacant.

New Brunswick
Due Aug 11, 2026View bid
CanadaBuysCloses in 6 days

EE517-270175 Standing offers General contractor Quebec Region

Public Works and Government Services Canada (PWGSC), on behalf of National Defence is issuing this Request for a standing offerfor the service of General contractor for the Quebec region. All details related to the requirement are found in the solicitation.

Gatineau, Quebec
Due Aug 11, 2026View bid
CanadaBuysCloses in 6 days

CM - Wainwright Range and Training Area Program

*** THIS AMENDS THE PREVIOUSLY POSTED NOTICE TO CHANGE THE CLOSING DATE TO AUGUST 11, 2026. TIME AND CLOSING LOCATION REMAIN UNCHANGED *** Defence Construction Canada – Request for Proposal - Construction Management Services - Wainwright Range and Training Area Program, CFB Wainwright, Alberta, WW25CM01 DEFENCE CONSTRUCTION CANADA (DCC) is requesting Proposals from Construction Management firms to undertake the Wainwright Range and Training Area Program using a Construction Management (CM) approach. Additional details are provided in the Request for Proposals (RFP) documents. The estimated construction cost for this Project is in the range of $400 Million. Firms that consider themselves qualified to provide these services are invited to submit their proposals through the MERX Electronic Bidding System on or before the closing date and time indicated on the Electronic Bidding System. This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), Chapter Nineteen of the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-GPA). The selected contractor will be required to hold a valid Designated Organization Screening (DOS), issued by the Contract Security Program (CSP) within Public Services and Procurement Canada (PSPC).  Details concerning the Security Requirements for this project are identified in Amendment No.1 to the tender documents. Questions regarding this solicitation are to be directed ONLY to the point of contact identified in this advertisement.  Bidders who address their questions to anyone other than the point of contact during the solicitation period may, for that reason alone, be disqualified. Bidders can obtain contract award results from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity. DCC now publicly discloses information on payments made to prime contractors so that subcontractors know when they can expect payment. Information on payments made in the past 90 days on construction contracts over $100,000, as well as further information regarding DCC’s prompt payment commitment, can be obtained from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity.  code : 1.01description : Project Manager Gestionnaire de projetunitOfMeasure : Hourly Ratecode : 1.02description : Site Superintendent Surintendant de chantierunitOfMeasure : Hourly Ratecode : 1.03description : Security Manager Gestionnaire de la sécuritéunitOfMeasure : Hourly Ratecode : 1.04description : Project Controls Manager Gestionnaire des contrôles de projetunitOfMeasure : Hourly Ratecode : 1.05description : Lead Quality Control Manager Gestionnaire principal du contrôle de la qualitéunitOfMeasure : Hourly Ratecode : 1.06description : Lead Scheduler Planificateur principalunitOfMeasure : Hourly Ratecode : 1.07description : Total Classification Rate Taux horaire pondéré totalunitOfMeasure : Hourly Ratecode : 2description : Construction Manager’s Percentage Fee for Construction Services Honoraires à pourcentage du gérant de construction pour les services de constructionratioType : MARKUPunitOfMeasure : PercentBidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Ottawa, Ontario
Due Aug 11, 2026View bid
SAM.govCloses in 6 days

FY 2026 Facility Upgrades for New Jersey and New York Recruiting Stations - Flooring Only

As of 24 July 2026: Amendment 0001 has been posted to respond to contractor RFIs and extend the bid due date. This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will be issued with this posting. This is a Request for Quotes (RFQ) for commercial services in accordance with FAR Part 12. This procurement is being solicited as a 100% SMALL BUSINESS SET-ASIDE. The applicable NAICS Code 238330 Flooring Contractors. The size standard is $19M.

United StatesFlooring
Due Aug 11, 2026View bid
SAM.govCloses in 6 days

Fort Lee Vehicle Recovery Range

Amendment 0003: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0003, extending the bid due date and bid opening date. Project Summary: The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.

Fort Lee
Due Aug 11, 2026View bid
SAM.govCloses in 6 days

Repair Airfield Stormwater Drainage Phase II

Repair Airfield Stormwater Drainage Phase II, This Requirement encompasses the work necessary to repair the stormwater drainage systems east of Taxiway J on Dobbins ARB. See attached Specifications and Drawings

United StatesExcavation Earthwork · Grading Drainage
Due Aug 11, 2026View bid
CanadaBuysCloses in 6 days

Request for Expression of Interest for Liri Valley Apartments and Rowhouses

???????English Description DEFENCE CONSTRUCTION CANADA (DCC) – HAAED99_CN86264 – Liri Valley Apartments and Rowhouses at CFB Edmonton, AB ??????? Defence Construction Canada (DCC) invites general contractors to express their interest in providing all labour, materials, equipment necessary to build and commission six rowhouse buildings of 4 units each, and two apartment 6-plexes at CFB Edmonton, AB. Work includes exterior work, parking lot and utility connections as well as structural, mechanical, and electrical work. This Request for Expression of Interest (RFEOI) is the first step of a two-step solicitation process, the second step being the Tender Phase.  Only general contractors that have expressed their interest through the Electronic Bidding System prior to the closing date and time of this RFEOI will be invited to submit a proposal at the second stage. Only submissions received in accordance with the requirements of the Electronic Bidding System will be considered. Only the general contractors who will have responded to this RFEOI will be invited to submit a bid during the Tender Phase. DCC reserves the right to terminate this solicitation at the end of the RFEOI. As part of Canada’s commitment to maximize the participation of Indigenous Businesses, bidders are advised that this solicitation includes an Indigenous Benefits Plan (IBP). The Contractor will have to include Indigenous businesses (or eligible joint ventures) as subcontractors or suppliers to this project. Further details will be provided in the Tender phase. This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-GPA). Project background The aim of the project is to deliver the construction of apartments and rowhouses on Liri Valley road in the RHU area at 3 Canadian Division Support Base Edmonton as part of the Canadian Forces Housing Agency (CFHA) -Residential Portfolio Capital Investment Plan (RPCIP) Phase 1 program. The intended scope of this work will include: Apartments: Two apartment 6-plexes (12 RHUs) including parking lot and utility connections. Rowhouses: Six Rowhouse Buildings of 4 units each (24 RHUs) including exterior work and utility connections. Implementation including construction and commissioning. The design will meet sustainability, energy efficiency, GHG reduction, water conservation, and resiliency targets through internal performance requirements.   Documents Technical plans and specifications are not available during this RFEOI and will be provided during the Tender Phase; however, the Standard Construction Contract Documents for Electronic Bidding, DCL 250E, are available on DCC's website: https://www.dcc-cdc.gc.ca/industry/forms. Tenderers are advised that this contract is subject to DCC's Procurement Code of Conduct, which can be downloaded at https://www.dcc-cdc.gc.ca/industry/forms. A contractor or supplier who has been declared ineligible or suspended by Public Services and Procurement Canada under its Ineligibility and Suspension Policy and whose period of ineligibility or suspension may not have expired will not be able to proceed to the second stage. Bid security will be required during the Tender Phase in accordance with DCL193E- Instructions for Bidders for Electronic Bidding item 5. Estimate The Rough Order Magnitude estimate for this Contract is $25 Million (Current Year $). This amount includes all construction costs, on-site work (including all required services, parking, and landscaping), site utilities, necessary redundant mechanical systems, communication conduits and wiring, backup power equipment, built-in equipment, built-in furniture, and inflation to achieve substantial completion. This amount excludes HST, design costs, travel and disbursements, consultant fees and expenses, movable equipment and furniture, IT equipment and contingencies. Schedule DCC will proceed with the Tender Phase around August 2026. The works shall reach substantial completion no later than 700 calendar days following the notification of contract award and shall be completed no later than 30 calendar days after the substantial completion date. Site visit No site visits will be offered during the RFEOI however, during the Tender Phase, bidders will be invited to a site visit. Access to information Act Tenderers are advised that DCC is subject to the provisions of the Access to Information Act (Canada). Information submitted may be eligible for disclosure in accordance with the requirements of the Act. Questions and clarifications Any questions or requests for clarification must be submitted in writing to DCC's Coordinator, Contract Services whose contact information can be found in the Electronic Bid System. DCC reserves the right to request clarification and/or confirmation regarding any aspect of this RFEOI to the Tenderer. In such a case, the Coordinator, Contract Services will be responsible for making the request. The request for clarification and/or confirmation will be sent to the contact person identified on the Electronic Submission System. Language of the Tender and the contract By submitting a response to this RFEOI, Tenderers will be invited to choose the desired official language for the tender documents and any resulting contract. In the Tender Phase, tender documents will be published in the language chosen by the Tenderer in the Electronic Bid System. Unless otherwise specified in the Contract, all Contract Documents to which the Contract applies or refers, as well as all deliverables, documents, reports and results of the work, services or goods that the Contractor submits, provides, or delivers to DCC or Canada in connection with the performance of the Contract, shall be in the language chosen by the Contractor on the Electronic Bid System. Joint venture A joint venture is an association of two or more parties that pools their funds, assets, knowledge, expertise, or other resources into a joint business venture, sometimes called a consortium, to bid together for a requirement. Tenderers submitting interest as a joint venture will be required to clearly indicate in the Electronic Submission System that they are forming a joint venture and should provide the following information: the name of the joint venture, if applicable, the name of the representative of the joint venture, i.e., the member chosen by the other members to represent them, if applicable, the name of each member of the joint venture. Closing location Responses to this RFEOI must be received through the Electronic Bidding System.  Responses sent by fax, mail or email will not be accepted.  Closing Date and Time The closing date and time indicated in the Electronic Submission System will be the official closing date and time of this RFEOI.  Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Edmonton, Alberta
Due Aug 11, 2026View bid
SAM.govCloses in 6 days

Crownpoint Medical Gas Upgrade Construction

Amendment A0003 See attached B05 Amendment A0003-75H70126R00028 for detailed information. ###################################################################################################### Amendment A0002 See attached B05 Amendment A0002-75H70126R00028 & B01 RFP 75H70126R00028 Crownpoint Medical Gas Upgrade Amended by A0002 for detailed information. ###################################################################################################### Amendment A0001 See attached B05 Amendment A0001-75H70126R00028 for detailed information. ###################################################################################################### This is a Solicitation Notice for solicitation number 75H70126R00028, Crownpoint Medical Gas Upgrade Construction, a construction project for the Indian Health Service (IHS), Division of Engineering Services (DES) prepared in accordance with FAR Part 36. This project is to construct the MEDGAS system at the Crownpoint Hospital from the revised construction design completed in 2024. The complete medical code update report will be provided at the issuance of RFP. This project will be procured as a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside solicitation under North American Industry Classification System (NAICS) 236220, Commercial and Institutional Building Construction. The associated size standard for this procurement is $45 million. Please review all attachments to this notice for details. SCOPE OF WORK: See Section C of the attached solicitation for details. LOCATION OF PROJECT: All work shall be performed at the following three (3) locations. This project is at the Crownpoint Healthcare Facility, in Crownpoint, NM. CONSTRUCTION DURATION: Period of Performance is 120 calendar days after issuance of a Notice to Proceed. CONSTRUCTION MAGNITUDE: In accordance with FAR 36.204, the magnitude of this construction project is anticipated to be between $500,000.00 and $1,000,000.00. SITE VISIT: See Section L.6. Pre-Proposal Site Visit CONTRACT TYPE: The IHS intends to award a Firm Fixed Price (FFP) construction contract in support of this requirement. This solicitation will be procured as a Request for Proposal (RFP) in accordance with FAR Part 15 and 36 procedures. PROPOSAL REQUIREMENTS: See Sections L&M of the solicitation. PROPOSAL DUE DATE: The offeror’s proposal shall be submitted electronically no later than the due date and time indicated in block 13 of the SF 1442, unless changed by amendment. EVALUATION: In accordance with FAR 15.103-2, the evaluation for this award will be based on the lowest price technically acceptable proposal (LPTA). See Sections L&M of the solicitation for specific requirements. Prices proposed must reflect the offeror’s understanding of the requirement, ability to perform, and be considered fair and reasonable to the Government. Price is the discriminating factor for award among eligible offers. The total firm fixed price listed in block 17 of the SF1442 shall be utilized for the overall price evaluation and to determine the lowest priced offer. QUESTIONS: Offerors shall submit all questions concerning this solicitation in writing to the Contract Specialist, Jong Kim, at jong.kim@ihs.gov NOTE: ALL DATES ARE SUBJECT TO CHANGE. SEE SOLICITATION FOR OFFICIAL DATES, TIMES, AND LOCATIONS OF SITE VISITS AND DEADLINES. For the purposes of this procurement, a concern is considered a small business if its average annual revenue for the last five (5) years is less than $45 million. For information concerning NAICS and SBA size standards, go to http://www.sba.gov. It is the responsibility of the contractor to check https://sam.gov/ frequently for any amendments or changes to the solicitation. Hard copy documents will NOT be available – all documents for proposal purposes will be posted at the website for download by interested parties. NOTE: Registration in the System for Award Management (SAM) database is mandatory to be considered for award. Offerors may obtain information on registration and annual confirmation requirements via the internet at: https://www.sam.gov. Contractors are encouraged to complete SAM registration as soon as possible; the government may not delay award for the purpose of allowing a contractor additional time to register in SAM.

Crownpoint
Due Aug 11, 2026View bid
CanadaBuysCloses in 6 days

Stage 1 - UV Reactors Replacement, Prince Albert National Park

5P468-26-0101/A Stage 1 - UV Reactors Replacement, Prince Albert National Park BIDS RECEIVED BY FAX AND EMAIL WILL BE ACCEPTED AS OFFICIAL. PARKS CANADA IS NOT CURRENTLY ACCEPTING BIDS VIA SAP ARIBA, YOU MUST SUBMIT YOUR BID VIA FAX OR EMAIL AS INDICATED IN THE SOLICITATION DOCUMENT. BIDS RECEIVED IN-PERSON OR BY COURIER WILL NOT BE ACCEPTED. The only acceptable email address for responses to the bid solicitation is soumissionsami-bidsrpc@pc.gc.ca. Bids submitted by email directly to the Contracting Authority or to any email address other than soumissionsami-bidsrpc@pc.gc.ca will not be accepted. The only acceptable facsimile for responses to bid solicitations is 1-855-983-1808. The maximum email file size that Parks Canada is capable of receiving is 15 megabytes. The Bidder is responsible for any failure attributable to the transmission or receipt of the emailed bid due to file size. The Bidder should be cognisant of the size of the email as a whole, and not only the attachments. Please take into consideration that some attachments, when sent, may be resized during the email transfer. If the email size is too large, the Bidder should send the bid in multiple emails properly labeled with the solicitation number, project name, and indicate how many emails are included (ex. 1 of 2). Emails with links to bid documents will not be accepted. Bid documents must be sent as email attachments. SPECIAL INSTRUCTIONS TO BIDDERS (SI) This is the first stage (Stage one) of a two-stage competition: the first stage will evaluate the qualifications of all bidders; second stage (Stage two) will invite the qualified bidders to provide further qualifications and a financial bid on the project based on the specifications and drawings. Upon award of contract in Stage Two the pre-qualification list will expire and will not be used in any other solicitation. The qualification list will expire within 180 days or upon award of a contract in Stage Two, whichever is earlier, and the prequalification list will not be used in any other solicitation. Parks Canada reserves the right to re-issue Stage One via a /B solicitation if it is determined there is insufficient competition to proceed with Stage Two. Bidders that have qualified in Stage One /A will not be required to resubmit on the Stage One /B. Bidders that failed to demonstrate compliance on the Stage One /A may resubmit and will be considered in Stage One /B. Stage Two Bidders will be provided an INVITATION TO TENDER (ITT) for further qualifications and the financial evaluation in relation to the specifications and drawings. Please note that the ITT used in Stage 2 of this process will be a Two-Envelope ITT with an Indigenous Participation Plan (IPP) and a price evaluation component. The attached sample is only being provided for bidders to reference the General Conditions. LIST OF PRE-QUALIFIED BIDDERS: A list of pre-qualified bidders from Stage One will not be released. Contract award notice of the successful bidder of Stage Two will be posted on http://canadabuys.canada.ca/en/tender-opportunities PARTNER WITH ANOTHER BUSINESS: Potential and interested sub-contractors are invited to add their company’s name under the section “Partner with another business” REQUIREMENT Parks Canada requires a qualified contractor to replace the UV reactors at the Waskesiu water treatment plant. To assist with bonding and insurance requirements, this project is estimated at a value between $500,001 > $ 1,000,000, Taxes extra. PERIOD OF CONTRACT / DELIVERY DATE Contractor must perform and complete the Work no later than March 31, 2027. ENQUIRIES All enquiries of a technical and contractual nature are to be submitted to the Contracting Authority. Enquiries regarding this solicitation must be submitted in writing and should be received no later than five (5) business days prior to the date set for solicitation closing to allow sufficient time to provide a response. Enquiries received after that time may result in an answer NOT being provided. INFORMATION National Parks Regulations require that all work is to be performed in accordance with the ordinances, laws, rules and regulations set out in the National Park Act. Bidders that consider themselves qualified to provide this Work and intend to submit bids on this project should obtain documents from the Government Electronic Tendering Service through the Government of Canada tendering service at http://canadabuys.canada.ca/en/tender-opportunities. Addenda, when issued, will be available from the Government of Canada tendering service. Bidders that elect to base their bids on documents obtained from other sources do so at their own risk. Late submissions will not be considered. The Crown retains the right to negotiate with suppliers on any procurement. Documents may be submitted in either official language of Canada. Parks Canada has made every effort to provide equivalent documents in both official languages, however, if you find any discrepancies between the English and French documents, please notify the contract officer listed in this opportunity as soon as possible so that we can rectify the situation.

Saskatchewan
Due Aug 11, 2026View bid
CanadaBuysCloses in 6 days

EZ899-270189 Lower Liard River Bridge Stringer Repairs Phase 2

Lower Liard River Bridge Stringer Repairs Phase 2. This is the Phase 2 solicitation following an Invitation to Qualify. Only qualified suppliers have been invited to bid.

British Columbia
Due Aug 11, 2026View bid
SAM.govCloses in 6 days

Repair Base Switching Station

The names of firms that submitted acceptable proposals in step one are as follows: North Ridge JV LLC. 206 N Division ST Pinehurst, Idaho 83850-1017 Palouse Power LLC. 4745 State Route 281 N Quincy, Washington 98848-9166

Mountain Home AFBElectrical
Due Aug 11, 2026View bid